
About
Unigold Inc. is a Canadian-based, growth-oriented, junior natural resource company focused on exploring and developing its gold projects in the Dominican Republic, a country known for its potential in gold and polymetallic mineralization. The company boasts proven management with global experience in discovering, advancing, constructing, and operating projects. It operates in a stable jurisdiction with an expanding mining sector and established mining laws. Unigold has made significant discoveries and expansions, holding key land in a new Au/Cu trend, and benefits from exceptional geology with a large VMS/Epithermal Au/Cu system. The company has over 20 exploration targets and maintains an extensive technical database, demonstrating its credibility through technical, community, and environmental due diligence.
Verified company data
- Cash position
- $8.9 million
- Shares outstanding
- 338,803,817
- Fully diluted shares
- 379,119,814
- Mineral resource
The Candelones Project is currently composed of two distinct mineralization zones: the Candelones Main and Connector (“CMC”) and the Candelones Extension (“CE”). As previously predicted by Micon's QPs, the new drilling has allowed joining the CM and CMC zones into a single continuous zone. The present Candelones resource update is focused on the updated economic parameters for the oxidized portion of the CMC zone which were used as the basis for the oxide PEA described in this Technical Report. The sulphide portions of the CMC and the CE models have not only been updated to reflect the new economic parameters but, in the case of the CE zone, have been updated to reflect the new drilling information obtained during the 2015, 2016, 2019, 2020 and 2021 drilling.
Oxide Mineral Resource Estimate for Candelones Project PEA, Effective Date May 10, 2021
Deposit Mining<br>Method Mineralization Type Category Tonnes<br>(x1,000) Au g/t Au oz<br>(x1,000) Strip Ratio CMC Open Pit (Starter) PEA Oxide (Heap Leach) Measured 1,851 0.82 49 0.13 Indicated 1,616 0.82 42 Total Measured + Indicated 3,467 0.82 91 Oxide (Heap Leach) Inferred 1,154 0.6 22 Transition (Heap Leach) 478 0.87 13 Total Inferred 1,632 0.68 36 Sulphide Mineral Resource Estimate for the Candelones Project, Effective Date May 10, 2021
Deposit Mining<br>Method Category NSR$ Cut-off Tonnes<br>(x1,000) AuEq g/t Au g/t Ag g/t Cu % AuEq oz<br>(x1,000) Au oz<br>(x1,000) Ag oz<br>(x1,000) Cu lb<br>(x1,000) Strip<br>Ratio CE Open Pit (Ultimate) Measured 20 6,280 2.22 1.90 3.28 0.18 449 383 662 25,042 7.46 Indicated 20 13,098 1.63 1.40 4.18 0.12 688 591 1,762 34,201 M+I 20 19,378 1.82 1.56 3.89 0.14 1,137 974 2,425 59,243 Inferred 20 18,594 1.55 1.38 2.93 0.09 928 826 1,749 36,022 CMC 20 4,448 1.38 1.25 1.17 0.07 197 178 167 7,207 0.91 CMC + CE Inferred Subtotal 20 23,042 1.52 1.36 2.59 0.09 1,125 1,005 1,916 43,229 N/A CE Underground Measured 77 759 3.15 2.65 1.88 0.29 77 65 46 4,836 N/A Indicated 77 348 2.73 2.35 2.32 0.22 31 26 26 1,652 M+I 77 1,107 3.02 2.56 2.02 0.27 107 91 72 6,488 Inferred 77 417 2.63 2.32 3.53 0.17 35 31 47 1,535 CMC 77 338 2.72 2.46 0.81 0.15 30 27 9 1,114 CMC + CE Inferred Subtotal 77 755 2.67 2.38 2.31 0.16 65 58 56 2,649 Sulphides Total Measured + Indicated 20,484 1.89 1.62 3.79 0.15 1,244 1,065 2,497 65,731 Sulphides Total Inferred 23,797 1.55 1.39 2.58 0.09 1,190 1,063 1,972 45,878 - Projects
Candelones Oxide Project
Subscribe for updates Corporate Presentation
Project
The following information is taken from the 2022 Micon Feasibility Report (FS). This report focuses on the Main Zone oxide mineral resources at the Candelones project.
Mining
The oxide resources that are the subject of the 2022 feasibility are located close to the surface and would be mined by open pit methods over an operating period of slightly more than three years.
The operations will consist of a conventional open pit truck and shovel. The oxide material is friable and relatively soft and can be removed by ripping with no drilling and blasting activities designed. The open pit will be fully operated by a contractor, while Unigold will remain responsible for sourcing the aggregates for construction.
Ore material will be sent to either the heap leach facility or an ore stockpile; the stockpile will serve as complement to feed the leach pad during periods of low pit-production in the rainy season (August to October). Waste material will be sent to the waste dump storage (WDS) located southeast of the pit.
The mine will operate 360 days per year, with five days for scheduled maintenance and down-time. Mining will be carried out during a single twelve-hour shift per day. The mining of the pit will be divided into six pushbacks during the 3.3 years of operation and be executed in 5 m benches.
A mining rate of 5,000 t/d has been selected and this would result in a life-of-mine of approximately 3.3 years (39 months). The ramp-up period occurs over the first two months, followed by 36 months of mining at peak capacity, and the last month of post-peak production ramping down. The target peak mining rate is 150 kt/month (5,000 t/d); however, this production rate has been adjusted to reflect the rainy season that occurs during the months of August through October.
The mining dilution has been assessed by considering the nature of the operation. Given that no drilling/blasting activity is planned and given the relatively small size of equipment, an estimate of 2.5% has been made for the mining dilution (0.25 m over 10 m block). The size of the equipment and the bench height also allow for a estimated minimal ore loss of 2.5%.
On average there are two active mining areas within the pit to provide flexibility during the rainy months.
Processing
From the Candelones Main and Connector open pit areas, approximately 5,000 t/d of oxide mineralization will be mined and then transported into the heap leach pad area. The material fed to the leaching process will be coarse screened to remove competent rock from the more friable fine fraction. The heap leach pad will be irrigated with a barren leach solution (BLS) containing up to 1,000 ppm of NaCN and lime to ensure that suitably high solution pH is present in the leachate after leaching. Gold dissolution is expected to be relatively rapid and to reach 89% of the contained gold extraction after 90 days of leaching. A portion of silver will be recovered as well although this is excluded from the financial model.
Pregnant leach solution (PLS), the main product of the leaching process, will be pumped from the main PLS pond to the feed tank of the carbon-in-columns (CIC) circuit. The PLS solution will be contacted in a counter current process with activated carbon to adsorb the dissolved previous metals. The loaded carbon from the CIC circuit will then report to an adsorption, desorption and regeneration (ADR) plant, comprising acid wash, elution, carbon preparation – regeneration and disposal, electrowinning cells and a refinery to produce Doré bars.
The predicted precious metal dissolutions and reagent consumptions were determined from column leach testwork carried out by Bureau Veritas Commodities Canada Ltd., Vancouver. The process design criteria are based on the analysis of the metallurgical test data including bottle roll testing with a focus on column leach test results.
Material that is below economic cut-off (“waste") will be stored in a conventional Waste Rock Dump (WRD). A Tailings Storage Facility (TSF) will not be required for the Project due to the nature of the heap leach process and Adsorption Desorption Recovery (ADR) method used.
Infrastructure
The infrastructure included in the feasibility includes the following:
- Heap leach facility
- Waste rock storage
- Access and Site roads.
- On-site power generation and site electrical distribution system.
- Bore holes, pumps and piping for site fresh water supply.
- Process solution ponds.
- Process facility buildings, including control room and secure gold room.
- Modular units for administration, offices, dry, lunchroom, first aid building and security gate.
Capital and Operating Costs
The expected accuracy of the feasibility study capital and operating estimates is ±15%. The estimates are expressed in third quarter 2022 United States dollars, without provision for escalation. Where appropriate, an exchange rate of DOP 54/US$ has been applied.
Item Initial Capital<br>US$’000 Sustaining Capital<br>US$’000 LOM Total<br>US$’000 Mining 1,708 935 2,643 Processing Plant 9,972 - 9,972 Infrastructure 16,420 - 16,420 EPCM, Indirect 1,825 - 1,825 Owners Costs 1,896 - 1,896 Sub-total before contingencies 31,822 935 32,757 Contingencies 4,099 - 4,099 Grand total Capital 35,922 935 36,857 Closure and Rehabilitation 466 4,663 5,129 Operating costs were estimated based on similar operations with some modifications to reflect the contractor costs for the oxides obtained by Unigold. It is Micon’s QP’s opinion that the costs are reasonable, but they were not developed from first principles and are considered conceptual in nature.
Parameters LOM Total $’000 $/t Treated US$/oz Au Mining costs 23,107 4.13 224 Processing costs 31,056 5.55 302 General & Administrative costs 7,316 1.31 71 Subtotal Cash Operating Costs 61,479 10.98 597 Selling expenses incl. Royalty 17,826 3.18 173 Total Cash Cost 79,305 14.17 770 Feasibility Economic Analysis
Basis of Evaluation
Micon prepared its assessment of the Project on the basis of a discounted cash flow model, from which the Internal Rate of Return (IRR) and Net Present Value (NPV) can be determined. Assessments of NPV are generally accepted within the mining industry as representing the economic value of a project after allowing for the cost of capital invested.
Exchange Rate and Inflation
All results are expressed in United States dollars, except where otherwise stated. Cost estimates and other inputs to the cash flow model for the Project have been prepared using constant, third quarter 2022 money terms, i.e., without provision for escalation or inflation.
Expected Metal Prices
Project revenues will be generated from the sale of gold doré bars. The Project has been evaluated using a constant metal price of US$1,650/oz Au. This is close to current market levels and below the average achieved over the 36 months ending 30 September, 2022. The following chart shows monthly average prices for gold over the past ten years, along with the 36-month trailing average price over that period.
Taxation and Royalty Regime
Dominican Republic provincial income and mining taxes have been provided for in the economic evaluation. There is a 5% royalty on gold sales payable to the Government of the Dominican Republic. The amount paid to the Government under this royalty forms a minimum tax and is credited against Income tax payable. Should income tax payable be lower than the royalty paid, no refund of the royalty amount is allowed. Depreciation of capital costs is allowed on a unit of production basis, and income tax is levied at the rate of 27% on net earnings. Unigold is also subject to a levy of 5% of after-tax income payable to support local community projects. According to Unigold’s public disclosure there is also an outstanding option held by a third party to acquire a 2% revenue royalty over the project.
Micon has applied a 10% royalty on revenue in order to account for the various tax and community burdens, and also applied a 27% tax on remaining income in the economic analysis presented for this study.
Technical Assumptions
The technical parameters, production forecasts and estimates summarized below and described in detail within the feasibility study are reflected in the base case cash flow model. The assumptions and estimates are provided below.
Production Schedule
Annual tonnages of waste rock and material heaped on the leach pad, the average ore grade, stripping ratio and the gold content of the material to be leached are shown in the following figure.
Heap leach extraction of gold has been modelled assuming 88.0% recovery from oxide material and 58.9% from the transition zone, for a weighted average recovery of 84.9% (Figure 1.4). Notwithstanding column testwork showing more rapid leaching, the cash flow model assumes full recovery of the leachable gold will require 3 months from placement of material on the heap.
A further 7 days of sales is provided in working capital for accounts receivable. Stores and accounts payable are provided for with 45 and 30 days, respectively.
Operating Margin
The following figure shows the annual sales revenues compared to capital expenditure and cash operating costs. The Project is forecast to generate an average operating margin of 53% over the LOM period.
Project Cash Flow
At $1650/oz, pre-tax cash flows provide an internal rate of return (IRR) of 52.4%; when discounted at the rate of 5% per year, the pre-tax net present value (NPV5) is $38.2 million. The payback period is approximately 1.5 years.
At $1650/oz, after-tax cash flows provide an IRR of 43.6%; after-tax NPV5 is $30.6 million. Profitability index (i.e., the ratio of NPV5/Initial Capital) is 0.9. The after-tax payback period is 1.6 years.
Period Units LOM Total Yr-1 Yr1 Yr2 Yr3 Yr4 Tonnes treated (t'000) t'000 5,597 - 1,612 1,800 1,799 387 Heaped Grade g/t Au 0.67 - 0.74 0.70 0.64 0.46 Gold Content koz Au 121.35 - 38.23 40.44 36.98 5.70 Gold Sales (payable oz) koz Au 102.97 - 28.47 33.54 32.27 8.69 Gross revenue $'000 169,894 - 46,970 55,342 53,252 14,331 Mining $'000 23,107 - 6,190 7,052 8,109 1,757 Processing $'000 31,056 - 10,064 9,538 9,426 2,028 G&A $'000 7,316 - 2,107 2,353 2,351 506 Cash operating costs $'000 61,479 - 18,360 18,943 19,886 4,290 Selling costs $'000 17,826 - 4,930 5,807 5,584 1,504 Total Cash Costs $'000 79,305 - 23,290 24,750 25,471 5,794 Net cash operating margin $'000 90,589 - 23,680 30,592 27,781 8,537 Initial capital $'000 35,922 35,922 - - - - Sustaining capital $'000 935 - 154 320 260 201 Closure provision $'000 5,129 466 - - - 4,663 Change in working capital $'000 - - 1,033 151 (24) (1,159) Net Cash flow before tax $'000 48,603 (36,388) 22,493 30,121 27,545 4,832 Taxation $'000 8,788 - 2,398 3,513 2,878 - Net Cash flow after tax $'000 39,815 (36,388) 20,096 26,608 24,667 4,832 Disc. cash flow (5%) $'000 30,637 (34,656) 18,227 22,985 20,294 3,786 Cumulative disc. cash flow $'000 (34,656) (16,428) 6,557 26,851 30,637 Before Tax After Tax Internal Rate of Return % 52.4% 43.6% Undiscounted cash flow $'000 48,603 39,815 Net Present Value (5%) $'000 38,214 30,637 Net Present Value (7.5%) $'000 33,853 26,795 Net Present Value (10%) $'000 29,954 23,367 Total Cash Cost US$/oz 770 All-in Sustaining Cost US$/oz 829 All-in Cost US$/oz 1,178 Sensitivity Study and Risk Analysis
Micon tested the sensitivity of the base case after-tax NPV5 to changes in metal price, operating costs and capital investment for a range of 25% above and below base case values. Changes in gold grade and recoveries are equivalent to gold price changes of the same magnitude so these factors can be considered as equivalent to the price sensitivity.
The NPV of the project remains positive on +/- 25% changes to capital, operating cost and gold prices. As is normal in gold projects, NPV is most sensitive to changes in the gold price. The breakeven gold price, given the capital and operating cost assumptions, is about US$1200/oz.
News
09.01.26
08.14.26
05.06.26
Unigold provides an Update on Activities in the Dominican Republic
Subscribe for updates
Oops! Please input a valid email address.
Submit
I agree to and consent to receive news, updates, and other communications by way of commercial electronic messages (including email) from Unigold Inc. I understand I may withdraw consent at any time by clicking the unsubscribe link contained in all emails from Unigold Inc.
Unigold Inc.
Ste. 2704-401 Bay St.
P.O. Box 4
Toronto, Canada, M5H 2Y4
Continue
- Leadership
Joseph Hamilton, P.Geo, CFA (Chairman of the Board of Directors and CEO, Professional Geologist with over 30 years of experience in mineral exploration, capital markets and mine development.), Donna McLean, BA (Chief Financial Officer, Experienced CFO and Controller for numerous publicly-traded and private companies, managing financial reporting and controls.), Wesley C. Hanson, P.Geo. (VP Exploration, Over 32 years of industry experience including exploration, mine development, and project evaluation.), Sr. Ramón Tapia (Country Director, Dominican Republic, Responsible for Unigold’s operating subsidiaries in the Dominican Republic and government relations, previously a partner at Marat Legal.)
Verified data last updated:
Recent filings
Investor FAQ
The most recent news items are a September 1, 2026 release announcing strong community support for initiation of the Neita Project Environmental and Social Impact Assessment, and an August 14, 2026 release updating the Candelones Project mineral resource estimate to 2.291 million ounces of gold in Measured and Indicated Resources. An earlier May 6, 2026 release provided an update on activities in the Dominican Republic. Full text of these releases is not reproduced in the verified data provided.
Unigold's principal project is the Candelones Project in the Dominican Republic, which comprises the Candelones Main and Connector (CMC) and Candelones Extension (CE) mineralization zones. The Candelones Oxide Project is based on the 2022 Micon Feasibility Report focusing on Main Zone oxide resources, planned as a conventional open pit operation at 5,000 t/d over approximately 3.3 years with heap leach processing and a US$1,650/oz gold price assumption. The feasibility study reports an after-tax NPV5 of $30.6 million, an after-tax IRR of 43.6%, and an initial capital of US$35,922,000, with the May 10, 2021 PEA oxide resource and sulphide resource estimates also disclosed.
Answers last refreshed: