About
OceanaGold is a global gold mining company with a commitment to responsible mining practices. The company focuses on sustainable development, community engagement, and environmental protection while delivering value to shareholders. OceanaGold operates several mines and is dedicated to maintaining high standards of corporate governance and ethical practices.
Verified company data
- Cash position
- $655 million
- Shares outstanding
- 231,121,129
- Fully diluted shares
- 231,126,566
- Mineral resource
Mineral Reserves increased by 27% to 6.2Moz Au net of mining depletion at a 15% higher grade. Measured and Indicated Mineral Resources increased by 8% to 8.9Moz Au net of mining depletion. Initial Mineral Reserves of 4.1 Mt at 9.2 g/t for 1.21Moz Au declared for Wharekirauponga at Waihi. Increase in Mineral Reserves at Didipio by 0.14Moz Au net of mining depletion. Increase in Indicated Mineral Resources to 2.4 Mt at 17.9 g/t for 1.4Moz Au at Wharekirauponga. Increase in Indicated Mineral Resources by 0.17Moz Au at Macraes.
- Projects
Wharekirauponga: OceanaGold Corporation announces results from 16 new drill holes from the ongoing exploration and resource conversion program at Wharekirauponga, located approximately 10 kilometres north of the Company’s Waihi Operation in New Zealand. Drill results include multiple high-grade intercepts such as 6.3 m @ 97.2 g/t Au from 481.5 m, East Graben Vein (WKP146C) and 8.5 m @ 41.5 g/t Au from 399.0 m, EG Vein (WKP150). The drilling activity has accelerated with five active rigs and aims to further unlock value for shareholders at this deposit.
Waihi North Project: Construction and underground tunnelling activities at the Waihi North Project continue to advance to plan. Decline development has advanced approximately 350 metres to date, with the construction of the first ventilation shaft commenced. The project includes the development of the Wharekirauponga Underground mine and associated surface infrastructure, expansion of the current processing plant, and construction of a new tailings storage facility. Gold production from WUG is expected to begin in 2032, with first stope ore in 2033.
- Leadership
Gerard Bond (President & CEO, Experienced executive in global resources and finance with a background in corporate finance, mergers and acquisitions, and human resources. Previously Finance Director and CFO at Newcrest Mining Limited.), Sandra Dodds (Non-Executive Director, Brings almost 30 years of senior executive experience across infrastructure and engineering, previously CEO of Infrastructure at Broadspectrum.), Bhuvanesh Malhotra (Chief Operating Officer, Over 25 years of experience in operational and technical roles across multiple commodities, previously Technical Director at Rio Tinto.), Ian Reid (not discovered)
Verified data last updated:
Recent filings
- News release
- MD&A
- Interim financial statements/report
- News release
- News release
- OceanaGold Reports Exceptional High-Grade Drill Results at Wharekirauponga and Progress on Waihi North Project · OceanaGold Reports Exceptional High-Grade Drill Results at Wharekirauponga and Progress on Waihi North Project (QuoteMedia 6008011703741813)
- News release
- News release
Investor FAQ
The most recent document in the index is a press release dated 2026-11-17, and the company's most recent financial and management discussion documents are dated 2026-11-04. The verified company data was last updated 2026-11-13, but the body text of the November 2026 filings is not included in the available data, so their specific contents cannot be summarized here. Earlier in the index, OceanaGold issued press releases on 2026-09-24 reporting exceptional high-grade drill results at Wharekirauponga and progress on the Waihi North Project.
The Q3 2025 webcast was scheduled for November 6th, 2025 at 10:00am EST (7:00am PST), which has already passed as of the latest verified data. Gold production from the Wharekirauponga Underground (WUG) mine is expected to begin in 2032, with first stope ore expected in 2033. Ongoing drilling at Wharekirauponga, with five active rigs, and continued construction of the Waihi North Project, including decline development and the first ventilation shaft, are the near-term operational milestones described in the available data; specific dates for these are not disclosed in available filings.
Answers last refreshed: