Monument Mining Limited logo

Monument Mining Limited

TSXV:MMYLive AI agent

Investor website: https://monumentmining.com/

About

Monument Mining Limited is a Canadian publicly listed company focused on gold production and mining asset development. The company operates the Selinsing Gold Portfolio in Malaysia and the Murchison Gold Portfolio in Western Australia. The Selinsing Gold Mine is situated in Pahang State, Malaysia, and includes several properties such as Selinsing, Buffalo Reef, and others. The Murchison Gold Portfolio consists of properties like Burnakura and Gabanintha. Monument Mining has a producing mine, a historic site with a gold plant, and a significant land position. The company is led by an experienced management team and aims to increase shareholder value by developing its mineral assets.

Verified company data

Cash position
62.84M
Shares outstanding
346,218,368
Fully diluted shares
347,935,029
Mineral resource

The Company filed a report titled “Selinsing Gold Sulphide Project-NI 43-101” (“the 2019 FS”) at www.sedar.com and prepared by Snowden Mining Industry Consultants Pty Ltd (“Snowden”) January 31, 2019, describing the mineral exploration, development and production area of the Selinsing Gold Mine. Mineral Reserves and Mineral Resources were estimated by Snowden as Independent qualified person defined under NI 43-101 standards.

Tables 1 & 2 below summarize the estimated Mineral Reserves and Mineral Resources by area and ore type, all expressed in metric tonnes and Troy ounces (1 ounce = 31.1035 g).

Table 1: Selinsing-Buffalo Reef/Felda Mineral Resources as of March 31, 2018 (Snowden)

CategoryOXIDE (above 0.3 g/t Au cut-off)TRANSITION (above 0.5 g/t Au cut-off)SULPHIDE (above 0.5 g/t Au cut-off)OXIDE + TRANSITION + SULPHIDE
---------------
Mineral Resources, reported inclusive of Reserves (based on a potential US$2,400/oz gold price)
---
Measured*1,2650.4719-
Indicated**1,5330.85421,086
M+I2,7980.68611,086
Inferred***3491.0512485

*Measured Resource is entirely stockpile material; Indicated and Inferred Resource comprises in situ material occurring in Selinsing and Buffalo Reef/Felda deposits; **Indicated Oxide Resource is a combination of in situ oxide material occurring in Selinsing and Buffalo Reef/Felda deposits plus Selinsing Old Tailings material; Indicated Transition and Sulphide Resource comprises in situ material occurring in Selinsing and Buffalo Reef/Felda deposits; ***Inferred Resource comprises in situ material occurring in Selinsing and Buffalo Reef/Felda deposits

Table 2: Selinsing-Buffalo Reef/Felda Reserves as of March 31, 2018 (Snowden)

CategoryOXIDE (above approx. 0.4 g/t Au cut-off)TRANSITION (above approx. 0.75 g/t Au cut-off)SULPHIDE (above approx. 0.75 g/t Au cut-off)OXIDE + TRANSITION + SULPHIDE
---------------
Mineral Reserves (based on a US$1,300/oz gold price)
---
Proven*1,2650.4719-
Probable**9910.9129757
P+P2,2560.6748757

*Proven Reserve is entirely stockpile material; **Probable Oxide Reserve is a combination of in situ oxide material occurring in Selinsing and Buffalo Reef/Felda deposits plus Selinsing Old Tailings material; Probable Transition and Sulphide Reserve comprises in situ material occurring in Selinsing and Buffalo Reef/Felda deposits

The 2019 Selinsing and Buffalo Reef/Felda Mineral Resources were updated by John Graindorge, an employee of Snowden, who is the independent Qualified Person for the March 31, 2018 Mineral Resources as defined by NI 43-101. The 2019 Selinsing and Buffalo Reef/Felda Mineral Reserves were estimated by Frank Blanchfield, an employee of Snowden, who is the independent Qualified Person for the March 31, 2018 Mineral Reserves as defined by NI 43-101.

Recommendations

The opportunity to include inferred resources was also discussed in the Feasibility Study. The Inferred Mineral Resource inside the Reserve open pit designs potentially contains an additional 20 koz of gold. The Inferred Mineral Resource external to the open pit design contains 130 koz of gold. Recommendations have been suggested to initiate further exploration programs, aimed on conversion of Inferred Mineral Resources to Indicated Mineral Resources. Should those conversions be successful, the Mineral Reserves could potentially be significantly increased. The Selinsing Gold Mine has a proven record in converting oxide Inferred Mineral Resources to recovered ounces.

Western Australia- Murchison Gold Resources

Current Resources-Burnakura-July 2018

The Company filed a report titled “NI 43-101 Technical Report-Updated Mineral Resources, Burnakura Gold Project, Western Australia, Australia at www.sedar.com and prepared by SRK Consulting (Australasia) Pty Ltd (“SRK”) July 18 2018. Monument has focused work on updating and validating the historical resources at the Burnakura project into current resources under NI43-101 guidelines. To date this has resulted in the update of the deposits of Alliance and New Alliance (“ANA”); North of Alliance 1 to 8 (NOA); Federal City; and Authaal into current resource status.

Table E1-5 below shows a breakdown of the 2018 Mineral Resource estimates that make up the Burnakura project:

Table E-1: NOA 1–6 – Mineral Resource estimate

Resource categoryLower cut-off<br> (Au g/t)Tonnes (Kt)Grade<br> (Au g/t)Metal<br> (koz Au)
Indicated0.51,0302.168
Inferred0.56092.344

Table E-2: NOA7–8 Mineral Resource estimate

Resource categoryLower cut-off<br> (Au g/t)Tonnes (Kt)Grade<br> (Au g/t)Metal<br> (koz Au)
Indicated3.07764.6114
Inferred3.0353.94

Table E-3: ANA Mineral Resource estimate

Resource categoryLower cut-off<br> (Au g/t)Tonnes (Kt)Grade<br> (Au g/t)Metal<br> (koz Au)
Indicated0.52,1411.6107
Inferred0.5921.54

Table E-4: Authaal Mineral Resource estimate

Resource categoryLower cut-off<br> (Au g/t)Tonnes (Kt)Grade<br> (Au g/t)Metal<br> (koz Au)
Inferred0.55561.425

Table E-5: Federal City – Mineral Resource estimate

Resource categoryLower cut-off<br> (Au g/t)Tonnes (Kt)Grade<br> (Au g/t)Metal<br> (koz Au)
Indicated0.5961.34
Inferred0.52591.311

(1) Small discrepancies may occur due to rounding.

(2) All Mineral Resources have been reported on a dry tonnage basis.

(3) SRK is unaware of any issues that materially affect the Mineral Resources in a detrimental sense.

(4) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

(5) Mineral Resources estimated by David Slater (Principal Consultant, SRK), QP.

(6) Open pit Resources (NOA1-6, ANA, Authaal, Federal City) are constrained in a Lerchs Grossman pit shell, Underground Resources (NOA7-8) are constrained to >3g/t and 200m vertical depth.

Murchison Historical Resources

The Murchison portfolio contained historical resources of 644koz at the time of acquisitions. Monument is systematically performing all the necessary work to convert and validate these historical resources into current resources under NI43-101 guidelines. A breakdown of the historical resources is detailed in the table below.

Burnakura

JORC Historical Mineral Resource, at 1.0 g/t Au

ProjectCategorykTonnesAu(g/t)Au (kOz)Source
ANAIndicated5832.344Golders Jan 2013 (brn_OK_1301.fbm) Updated Mineral Resources for Alliance and New Alliance Deposits
Inferred4032.431
Federal CityIndicatedH&S May 2011 (authaal_gda.mdl) Burnakura Resource Estimates H&S_May 2011
Inferred1902.716
NOA1Indicated1003.010Golders Sept 2013 (brn_1013_ok.fbm) Burnakura deposit Resource Estimation - NOA 1 and 2
Inferred101.60.5
NOA2Indicated6374.898Golders Sept 2013(brn_1013_ok.fbm) Burnakura deposit Resource Estimation - NOA 1 and 2
Inferred1186.324
NOA4IndicatedH&S May 2011 (noa_hs_2011.mdl) Burnakura Resource Estimates H&S_May 2011
Inferred1401.99
NOA6IndicatedH&S May 2011 (noa_hs_2011.mdl) Burnakura Resource Estimates H&S_May 2011
Inferred1131.87
NOA7&8Indicated1,0322.996BMGS Sept 2012 (noa78.mdl) BMGS Resource Report NOA 7-8
Inferred2653.127
LewisIndicated1132.28BMGS sept 2012 (lewis1206.mdl) BMGS Resource Report -Lewis
Inferred572.04
AuthaalIndicatedH&S May 2011 (authaal_gda.mdl) Burnakura Resource Estimates H&S_May 2011
Inferred4402.028
BanderolIndicatedH&S May 2011 (banderol_hsgda2011.mdl) Burnakura Resource Estimates H&S_May 2011.
Inferred2001.510
TOTAL - BURNAKURAIndicated2,4653.2255
Inferred1,9352.5155

Gabanintha

JORC Historical Mineral Resource, at 1.0 g/t Au

ProjectCategorykTonnesAu(g/t)Au (kOz)Source
TumblegumIndicatedBMGS - Gabanintha Resource Report - (not completed), 2013
Inferred601.83
CanterburyIndicatedBMGS - Gabanintha Resource Report - (not completed), 2013
Inferred5001.727
TerrelsIndicatedBMGS - Gabanintha Resource Report - (not completed), 2013
Inferred7001.841
YagahongIndicatedBMGS - Gabanintha Resource Report - (not completed), 2013
Inferred501.52
Yagahong NorthInferredBMGS - Gabanintha Resource Report - (not completed), 2013
Inferred8002.975
Golden Hope NorthIndicatedBMGS - Gabanintha Resource Report - (not completed), 2013
Inferred1001.55
TOTAL - GABANINTHAIndicated
Inferred2,2102.16153

Tuckanarra

JORC Historical Mineral Resource, at 1.0 g/t Au

ProjectCategorykTonnesAu(g/t)Au (kOz)Source
Anchor LateriteIndicated171.41Ravensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred221.21
Bollard LateriteIndicated371.52Ravensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred971.34
Cable CentralIndicated451.72Ravensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred161.31
Cable EastIndicated2402.318Ravensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred591.94
Cable WestIndicated492.44Ravensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred613.06
Cable West (High Grade)Indicated354.05Ravensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred
Drogue LateriteIndicated1201.45Ravensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred371.21
LucknowIndicated111.71Ravensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred711.53
MaybelleIndicated702.86Ravensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred482.34
Maybelle NorthIndicated53.01Ravensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred922.27
Miners DreamIndicatedRavensgate, Tuckanara Resource Report (Finmod_tuck.dm) Nov 2012
Inferred632.86
TOTAL -TUCKANARRAIndicated5972.345
Inferred5662.036
Projects

Selinsing Gold Portfolio

  1. Selinsing Property 3.14 km2
  2. Buffalo Reef Property 1.80 km2
  3. Felda Land 15.86 km2
  4. Famehub Properties 129.50 km2

Quick Facts

------
LocationPahang State, Malaysia, 158km North of Kuala Lumpur
Selinsing Area Land150.3 km2
WorkforceApproximately 200 (including contractors)
Ownership100%
Mine TypeOpen pit
Deposit TypeOxide & Sulphide Gold
Process MethodGravity/CIL(Oxide) & Flotation(Sulphide)
Processing Capacity950,000 tpa*
Mineral Reserves**267 koz
Mineral Resources**880 koz
Estimated Mine LifeEstimated at 6 years with current resource-without further ore discovery

*tpa-tonnes per annum (Gold Sulphide Flotation Plant)

**Selinsing-Buffalo Reef/Felda Reserves and Resources as of March 31, 2018 (Snowden)

Overview

Located in the Central Gold Belt of Western Malaysia, the Selinsing Gold Mine covers a total area of 150.3km2 and includes the Selinsing, Buffalo Reef, Felda Land, Peranggih and Famehub properties. The mine is situated 158km north of Kuala Lumpur and has a gold processing plant and infrastructure buildings that are easily accessible from all the nearby properties.

The Selinsing and Buffalo Reef properties were acquired by Monument in June 2007. After completing a preliminary economic assessment, project financing and plant construction, the first CIL gold treatment plant started commercial production in October 2010. The plant capacity was increased from 0.4 to 1.00 million tpa in 2012. The oxide ore production by CIL plant ended in mid-November 2022, making way for the next phase of gold production: gold concentrate from the new sulphide gold flotation plant.

Sulphide gold production planning at Selinsing began with a NI 43-101 Report “Selinsing Gold Sulphide Project” (“the 2019 Feasibility Study”) produced by Snowden Mining Industry Consultants Pty Ltd, which replaced the existing gold inventory with gold resources of 880koz and reserves of 267koz at 1.45 g/t to extend the mine life by a further six years with upside potential. A gold sulphide flotation plant with a capacity of 950,000 tonnes per annum was built from March 2022 to March 2023 to process the sulphide ore. The first gold concentrate was filtered in December 2022, First gold concentrate shipments began in June 2023, commercial production began in September 2023.

Selinsing Gold Mine Road Map to Success

2007

June 2007

Acquired Selinsing and Buffalo Reef properties ($41m)

2008

June 2008

Capital Raises to Fund Mine Construction ($28m)

2009

October 2009

First Gold Pour from Gravity Circuit

2010

September 2010

Commercial production from CIL Circuit

2012

June 2012

Plant Expansion to 1M tpa-Tailing Storage Upgraded ($10.3m)

2016

December 2016

Updated NI 43-101 Reserves & Resources at Selinsing & Buffalo Reef

2017

May 2017

Commenced FEED & FS for Selinsing Gold Sulphide Processing

2017

October 2017

Closed Felda Block 7 Transaction

2018

July 2018

Completed FEED study for Selinsing Gold Sulphide Processing Project

2019

January 2019

NI 43-101 Feasibility Study for Selinsing Sulphide Project

2019

October 2019

Selinsing pours 1,000th Gold Bar

2020

February 2020

Discovers the Mentique Prospect

2021

February 2021

Commenced Sulphide gold project stage 1 flotation plant

2022

March 2022

Ground-breaking ceremony for flotation plant construction

2023

March 2023

Flotation plant construction completed

2023

June 2023

First gold concentrate shipments began

2023

September 2023

Commercial production began

2025

July 2025

Commencement of Expansion Drilling Program at Selinsing Gold Mine

Murchison Gold Portfolio

  1. Burnakura Property 125.6 km2
  2. Gabanintha Property 43.4 km2
  3. Tuckanarra Property 63.6 km2

Quick Facts

------
LocationMurchison Area, Western Australia, 765km Northeast of Perth
Murchison Area Properties232.6 km2
Ownership100% (Burnakura & Gabanintha) and 20% (Tuckanarra)
Mine TypeOpen Pits/Underground
Deposit TypeGold
Plant Capacity260,000 tpa*
NI 43-101-Indicated Resources293 koz Au
NI 43-101-Inferred Resources88 koz Au
Historical Resources**644 koz Au

*tpa-tonnes per annum **Historical Resources (JORC) at time of acquisitions

Overview

The Murchison Gold Project (“Murchison”) includes the Burnakura, Gabanintha and Tuckanarra (20% free carry interest) properties, which are in the Murchison goldfield of Western Australia, 40km southeast of Meekatharra and 765km northeast of Perth. The Murchison Goldfield has yielded approximately 35moz of gold to date and it still delivers significant production from a number of currently operating mines and there is great potential for further substantial discoveries utilising modern exploration.

Murchison was acquired in 2014 with historical resources of 644koz Au, a fully operational camp, 260ktpa gold processing plant (currently on care & maintenance) and several historical open pits and underground mines.

The Burnakura and Gabanintha properties were acquired in February 2014, having a total historical JORC Historical Resource of 563koz Au (153koz Au at Gabanintha, 410koz Au at Burnakura). Gabanintha is within trucking distance of the Burnakura plant. Since the acquisition, 381koz of Au resources have been reported to NI 43-101 standards at Burnakura comprising Indicated Resources of 293koz Au and Inferred Resources of 88koz Au. Monument has also refurbished a set of crushing circuits to upgrade the Burnakura gold processing plant and upgraded and maintained the 118 person mine camp and associated infrastructure ready for near term production.

The Tuckanarra project was purchased in November 2014 and contains an historical Indicated and Inferred JORC compliant resource of approximately 80koz Au. In December 2020, Monument sold an 80% interest in Tuckanarra to Odyssey Gold Ltd., leaving Monument with a 20% free carried interest until a decision to mine and a 1% NSR royalty over Odyssey’s 80% interest in the property. An unincorporated joint venture was formed with Odyssey to advance the exploration over Tuckanarra, with Odyssey solely responsible for funding the exploration and evaluation activities at Tuckanarra until a decision to mine is reached. The future processing of ore from tenements held by Odyssey through the Burnakura plant remains an option should commercial terms be reached.

Murchison Road Map to Production

2014

February 2014

Acquisition of Murchison Gold Project ($15m)

2014

November 2014

Acquisition of Tuckanarra Gold Property ($4m)

2014 ~ 2015

2014 ~ 2015

Completion of Drilling Program at ANA, Federal City

2015

April 2015

Filed NI 43-101 Resource Estimate on ANA

2015 ~ 2017

2015 ~ 2017

Completion of drilling programs at NOAs and crushing plant upgrade ready for installation; completion of initial economic assessment for CIL/HL production

2018

February 2018

Commenced underground mining scoping study, to be included in the PEA

2018

May-October 2018

Completed three drilling programs: ANA Deep Pit Drilling, NOA 7/8 Deep Exploration, and Burnakura Shallow Oxide; results have positive geological implications

2018

July 2018

SEDAR filed NI 43-101 Updated Mineral Resources

2019

September 2019

Murchison 3D structural study confirms near mine down-plunge potential and highlights regional prospectively

2020

July 2020

Drilling program successfully identified down plunge extensions of high grade gold mineralization at the Burnakura and Gabanintha projects

2020

December 2020

Completed a sale of 80% interest in the Tuckanarra Gold Project

2021

March 2021

Economic assessment update for the project including revised costings, pit optimisations and mine planning have all been reviewed independently by SRK

2021

June 2021

Commenced Exploration Program at Burnakura

2022

September 2022

Completed Exploration Program at Burnakura

2025

April 2025

Entered into MOU’s with Odyssey Gold and Great Boulder Resources to evaluate treating their ore at Burnakura plant

Leadership

Cathy Zhai (Director, President, CEO & Interim CFO, Ms. Zhai has been the President and CEO since January 2018, and formerly the Chief Financial Officer at Monument Mining Limited since 2001. She has over 20 years of extensive experience in executive management, business strategic planning, corporate finance, and corporate secretary mainly in the mining industry.), Andrew Charles Northfield (General Manager, Selinsing Gold Mine, Mr. Northfield is a mineral processing engineer with over 35 years of experience in the mining industry, specializing in gold processing techniques and operations.), Andrew Davies (General Manager, Monument Mining Australia, Andrew Davies is a senior mining development and project management professional with more than 25 years of experience delivering major capital projects across various countries.), Che Wan Alim (Vice President, Business Development, Wan Alim brings over 23 years of experience in the mining industry with a strong focus on gold and bauxite production.), Don Huntly (Chief Managing Geologist, Mr. Huntly is a geologist with more than 35 years of experience in mineral exploration, mining geology, and resource evaluation across Australia.)

Verified data last updated:

Recent filings

Investor FAQ

Answers last refreshed: