# Copper Giant (TSXV:CGNT)

> Orbiton powers / designed their website

## Key facts

- **Shares outstanding:** 188,634,512
- **Fully diluted shares:** 221,571,194 shares out fully diluted
- **Warrants:** 111,010,409
- **Options:** 10,635,500
- **Mineral resource:** mocoa copper-molybdenum project
effective date: november 1, 2021
based on 25,198 meters of drilling in 42 drill holes
data includes copper (cu) and molybdenum (mo) assays and geological core logging

table 1.1 - mineral resource estimate by cut-off grade
	•	cut-off 0.15% cueq: 721 mtonnes, cueq 0.42%, cu 0.31%, mo 0.035%, cueq 6.68 blbs, cu 4.85 blbs, mo 550 mlbs
	•	cut-off 0.20% cueq: 683 mtonnes, cueq 0.43%, cu 0.32%, mo 0.035%, cueq 6.54 blbs, cu 4.77 blbs, mo 530 mlbs
	•	cut-off 0.25% cueq (base case): 636 mtonnes, cueq 0.45%, cu 0.33%, mo 0.036%, cueq 6.31 blbs, cu 4.60 blbs, mo 511 mlbs
	•	cut-off 0.30% cueq: 553 mtonnes, cueq 0.48%, cu 0.35%, mo 0.039%, cueq 5.81 blbs, cu 4.24 blbs, mo 470 mlbs
	•	cut-off 0.35% cueq: 433 mtonnes, cueq 0.52%, cu 0.38%, mo 0.042%, cueq 4.96 blbs, cu 3.62 blbs, mo 405 mlbs
	•	cut-off 0.40% cueq: 330 mtonnes, cueq 0.57%, cu 0.41%, mo 0.047%, cueq 4.12 blbs, cu 2.99 blbs, mo 342 mlbs
	•	cut-off 0.45% cueq: 259 mtonnes, cueq 0.61%, cu 0.44%, mo 0.051%, cueq 3.47 blbs, cu 2.50 blbs, mo 293 mlbs
	•	cut-off 0.50% cueq: 201 mtonnes, cueq 0.65%, cu 0.46%, mo 0.056%, cueq 2.87 blbs, cu 2.04 blbs, mo 248 mlbs
	•	cut-off 0.55% cueq: 148 mtonnes, cueq 0.69%, cu 0.49%, mo 0.061%, cueq 2.26 blbs, cu 1.60 blbs, mo 200 mlbs
	•	cut-off 0.60% cueq: 106 mtonnes, cueq 0.74%, cu 0.52%, mo 0.067%, cueq 1.73 blbs, cu 1.21 blbs, mo 156 mlbs

table 1.2 - total inferred resource by zone
	•	oxide and transition: 139 mtonnes, cueq 0.41%, cu 0.32%, mo 0.026%, cueq 1.25 blbs, cu 0.99 blbs, mo 78.3 mlbs
	•	sulphide: 497 mtonnes, cueq 0.46%, cu 0.33%, mo 0.040%, cueq 5.06 blbs, cu 3.61 blbs, mo 432.7 mlbs
	•	total: 636 mtonnes, cueq 0.45%, cu 0.33%, mo 0.036%, cueq 6.31 blbs, cu 4.60 blbs, mo 510.5 mlbs

notes and assumptions
	•	resources estimated in accordance with cim definition standards
	•	in-pit resource shell generated using us$3/lb cu and us$10/lb mo
	•	cueq% = cu% + (mo% × 3.33)
	•	base case cut-off grade: 0.25% cueq
	•	metal recoveries applied: 90% cu, 75% mo
	•	pit shell parameters: cu price $3.00/lb, mo price $10.00/lb, slope 45°, mining cost $2.50/t, g&a cost $2.00/t, process cost $10.00/t
	•	mineral resources are not mineral reserves and do not have demonstrated economic viability

cautionary note
	•	regional forest reserve intersects western part of deposit
	•	resource-limiting pit shell restricted to 325m tonnes at 0.46% cueq, 0.34% cu, 0.036% mo (0.25% cueq cut-off)
	•	subject to resolution no. 110 (jan 28, 2022) from colombia’s ministry of environment
	•	compliance with procedures required; approval not guaranteed

qualified persons
	•	michel rowland (fausimm)
	•	robert sim (p.geo)
	•	bruce davis (fausimm)
	•	all independent and qualified under ni 43-101

reference
technical report on the mocoa copper-molybdenum project, colombia, dated january 17, 2022, effective november 1, 2021

_Verified data last updated: 2025-09-23_

## Recent filings

- 2026-05-20 — press_release — [CGNT_2026-05-20_06-44-08.pdf](https://chat.orbiton.app/lbcmf/preview/51659?documentId=51659)
- 2026-05-08 — press_release — [CGNT_2026-05-08_12-47-46.pdf](https://chat.orbiton.app/lbcmf/preview/38541?documentId=38541)
- 2026-05-05 — press_release — [Copper Giant Begins Planned Comprehensive PEA for the Mocoa CopperMolybdenum System with Globally Recognized Development Team](https://chat.orbiton.app/lbcmf/preview/38201?documentId=38201)
- 2026-04-28 — annual_report — [CGNT_2026-04-28_17-40-42.pdf](https://chat.orbiton.app/lbcmf/preview/32880?documentId=32880)
- 2026-04-28 — annual_report — [CGNT_2026-04-28_17-40-41.pdf](https://chat.orbiton.app/lbcmf/preview/32881?documentId=32881)
- 2026-04-28 — annual_report — [CGNT_2026-04-28_15-36-39.pdf](https://chat.orbiton.app/lbcmf/preview/35478?documentId=35478)
- 2026-04-28 — press_release — [Copper Giant, Working with the Colombian Government, Secures LongTerm Development Framework at Mocoa; Third Drill Rig Now Operational](https://chat.orbiton.app/lbcmf/preview/32883?documentId=32883)
- 2026-04-24 — annual_report — [CGNT_2026-04-24_18-06-41.pdf](https://chat.orbiton.app/lbcmf/preview/31020?documentId=31020)

## Investor FAQ

### [Latest news?](https://chat.orbiton.app/lbcmf/faq/latest-news)

Copper Giant has recently announced the commencement of a comprehensive Preliminary Economic Assessment (PEA) for the Mocoa Copper-Molybdenum System, collaborating with a globally recognized development team. This initiative is part of their ongoing efforts to advance the project.

### [Upcoming catalysts?](https://chat.orbiton.app/lbcmf/faq/upcoming-catalysts)

Upcoming catalysts for Copper Giant include the results from the ongoing Preliminary Economic Assessment (PEA) and further developments related to their collaboration with the Colombian government on the Mocoa project. Additionally, the operational status of the third drill rig may provide further insights into the project's progress.

## Live AI chat

- https://chat.orbiton.app/lbcmf/chat
