Copper Giant(TSXV:CGNT)

Orbiton powers / designed their website

About

Orbiton powers / designed their website

Verified company data

Shares outstanding
188,634,512
Fully diluted shares
221,571,194 shares out fully diluted
Mineral resource
mocoa copper-molybdenum project effective date: november 1, 2021 based on 25,198 meters of drilling in 42 drill holes data includes copper (cu) and molybdenum (mo) assays and geological core logging table 1.1 - mineral resource estimate by cut-off grade • cut-off 0.15% cueq: 721 mtonnes, cueq 0.42%, cu 0.31%, mo 0.035%, cueq 6.68 blbs, cu 4.85 blbs, mo 550 mlbs • cut-off 0.20% cueq: 683 mtonnes, cueq 0.43%, cu 0.32%, mo 0.035%, cueq 6.54 blbs, cu 4.77 blbs, mo 530 mlbs • cut-off 0.25% cueq (base case): 636 mtonnes, cueq 0.45%, cu 0.33%, mo 0.036%, cueq 6.31 blbs, cu 4.60 blbs, mo 511 mlbs • cut-off 0.30% cueq: 553 mtonnes, cueq 0.48%, cu 0.35%, mo 0.039%, cueq 5.81 blbs, cu 4.24 blbs, mo 470 mlbs • cut-off 0.35% cueq: 433 mtonnes, cueq 0.52%, cu 0.38%, mo 0.042%, cueq 4.96 blbs, cu 3.62 blbs, mo 405 mlbs • cut-off 0.40% cueq: 330 mtonnes, cueq 0.57%, cu 0.41%, mo 0.047%, cueq 4.12 blbs, cu 2.99 blbs, mo 342 mlbs • cut-off 0.45% cueq: 259 mtonnes, cueq 0.61%, cu 0.44%, mo 0.051%, cueq 3.47 blbs, cu 2.50 blbs, mo 293 mlbs • cut-off 0.50% cueq: 201 mtonnes, cueq 0.65%, cu 0.46%, mo 0.056%, cueq 2.87 blbs, cu 2.04 blbs, mo 248 mlbs • cut-off 0.55% cueq: 148 mtonnes, cueq 0.69%, cu 0.49%, mo 0.061%, cueq 2.26 blbs, cu 1.60 blbs, mo 200 mlbs • cut-off 0.60% cueq: 106 mtonnes, cueq 0.74%, cu 0.52%, mo 0.067%, cueq 1.73 blbs, cu 1.21 blbs, mo 156 mlbs table 1.2 - total inferred resource by zone • oxide and transition: 139 mtonnes, cueq 0.41%, cu 0.32%, mo 0.026%, cueq 1.25 blbs, cu 0.99 blbs, mo 78.3 mlbs • sulphide: 497 mtonnes, cueq 0.46%, cu 0.33%, mo 0.040%, cueq 5.06 blbs, cu 3.61 blbs, mo 432.7 mlbs • total: 636 mtonnes, cueq 0.45%, cu 0.33%, mo 0.036%, cueq 6.31 blbs, cu 4.60 blbs, mo 510.5 mlbs notes and assumptions • resources estimated in accordance with cim definition standards • in-pit resource shell generated using us$3/lb cu and us$10/lb mo • cueq% = cu% + (mo% × 3.33) • base case cut-off grade: 0.25% cueq • metal recoveries applied: 90% cu, 75% mo • pit shell parameters: cu price $3.00/lb, mo price $10.00/lb, slope 45°, mining cost $2.50/t, g&a cost $2.00/t, process cost $10.00/t • mineral resources are not mineral reserves and do not have demonstrated economic viability cautionary note • regional forest reserve intersects western part of deposit • resource-limiting pit shell restricted to 325m tonnes at 0.46% cueq, 0.34% cu, 0.036% mo (0.25% cueq cut-off) • subject to resolution no. 110 (jan 28, 2022) from colombia’s ministry of environment • compliance with procedures required; approval not guaranteed qualified persons • michel rowland (fausimm) • robert sim (p.geo) • bruce davis (fausimm) • all independent and qualified under ni 43-101 reference technical report on the mocoa copper-molybdenum project, colombia, dated january 17, 2022, effective november 1, 2021

Verified data last updated: 2025-09-23

Recent filings

Investor FAQ