
About
King Global Critical Minerals (CSE: KING) is located 62 miles north of Phoenix, Arizona, focusing on revitalizing historical mines with modern techniques. The Black Canyon project includes 15 former mines known for high-grade Silver, Gold, and Copper, situated in America's leading copper-producing state. The historic town of Cleator, established in 1864, reflects the rich mining heritage that the company builds upon. Led by CEO Robert Dzisiak and Executive Chairman Ben Hudye, the team combines financial expertise with geological knowledge, emphasizing thorough exploration over quick profits. The company is committed to a detailed exploration plan, including advanced surveys and a completed 2,500 meter drill program. King Global maintains strong insider ownership, ensuring alignment with shareholder interests, and aims to meet the growing demand for domestic mineral production.
Verified company data
- Cash position
- $1,400,000
- Shares outstanding
- 43929515
- Fully diluted shares
- 155760610
- Mineral resource
The Mikwam deposit is hosted within Timiskaming-aged polymictic conglomerate and greywacke units and contains disseminated and vein-hosted gold mineralization associated with quartz-carbonate veins and pyrite mineralization. In 2016, a NI 43-101 technical report prepared for Galena International Resources Ltd. disclosed a historical inferred mineral resource of 1,810,000 tonnes grading 2.34 g/t gold, containing 136,000 ounces of gold at a cut-off grade of 1.00 g/t Au. This estimate is historical in nature, was not prepared for King Global Ventures Inc., and should not be considered current. A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources and the issuer is not treating the historical estimate as current mineral resources.
- Projects
Black Canyon VMS Project
Flagship Asset in the Heart of Arizona’s Copper Country
Our Black Canyon project, located just one hour from Phoenix, encompasses 15 separate mines that once pulled high-grade Silver, Gold, and Copper from Arizona’s mineral-rich earth. This isn’t ancient history – it’s the foundation we’re building on. The property sits in America’s #1 copper-producing state, where mining has been a cornerstone of prosperity since the 1800s.
With 15 historic mines on the property and a geological setting analogous to the nearby United Verde Mine, which produced over 30 million tonnes of high-grade copper ore, the Black Canyon project is poised to become the next major VMS discovery in the region.
Our expert technical team is actively engaged in a systematic exploration campaign, employing cutting-edge geophysical surveys, geochemical sampling, and geological mapping to unlock the full potential of this exceptional asset. The recent completion of a VTEM survey, which identified several high-priority drill targets, underscores the immense potential for significant discoveries at Black Canyon.
Iron Horse
Program Objectives:
- Test the Core Gravity Anomaly
- Confirm Bedrock Source of Surface Iron Mineralization
- Evaluate Copper–Gold–Polymetallic Potential
- Define Structural Architecture
- Collect Foundational Technical Data
- De-Risk for Phase 2 Expansion
The initial drilling (IH-26-01 and IH-26-02) on our maiden, 14,000 foot diamond drilling program on the Iron Horse VMS project confirms a VMS-style hydrothermal feeder system. Both geology and geophysics align on the initial priority targets.
Based on geological, structural and lithogeochemical observations, the Company interprets the alteration corridor as a hydrothermal feeder conduit developed within the volcanic succession rather than a stratiform sulphide horizon. Correlation between drill holes IH-26-01 and IH-26-02 demonstrates continuity of the hydrothermal system and suggests local thickening and increased structural complexity within the corridor in hole IH-26-02.
Golden Turkey & Golden Belt Previously Mined Minerals Black Canyon Mountains Arizona
Highlights
Historical Records and Assays
● Golden Turkey vein system discovered in 1900 and mined 1931 through 1942
● Golden Turkey and Golden Belt mines represent vein hosted gold systems with significant past production
● Mine ceased production due to flooding and lack of available works during WW 2
● Historical (non 43-101 compliant) estimation that Golden Turkey previously mined minerals totals 245,000 tons
● 76 samples (ALS assayed) averaged approximately 3.85 g/t Au and 76 g/t Ag
● Several of the strongest samples also enriched with PB, Zn and Sb
● All sites to be surveyed by professional Engineering Consultant
● Other sites at Thunder Bolt, Gold Cord and Silver Cord to be assayed
Permits pending with National Forest
Joint Venture agreement with Security Minerals
● Joint Ventures Company Security Minerals Corp. owned 50% by King Global Critical Minerals
● King is entitled to 85% of the gross profit from separated minerals and 75% from aggregate sales
● King retains full ownership of its real property and claims
King actively pursuing options to monetize the previously mined minerals
Silver Cord
Silver Cord was discovered in 1877, with initial production beginning in 1910. Our eight-hole, 9,000-foot drill program was completed in September 2025, including a highlight intercept in Hole 4 of 9 feet (2.7 metres) grading 21.8 ounces (619.6 grams) per tonne silver, 1.0 g/t gold, 0.6% lead, 1.05% zinc, and 375 g/t antimony.
Hole 7 also intersected a high-grade 1.0-foot interval grading 625 g/t silver, 1.0% lead, and 1,175 g/t antimony. Silver Cord then completed its Phase 2 9,000-foot drill program in February 2026, with Hole 26-04 intersecting 6.0 feet grading 6.85 oz/t silver, Hole 26-05 intersecting 8.0 feet grading 5.48 oz/t silver and 0.08 oz/tonne gold, and Hole 26-07 intersecting 2.0 feet grading 5.39 oz/t silver.
Phase 2 drilling confirmed the continuity of high-grade silver-lead-zinc mineralization beyond the limits of historic underground development. Drilling also successfully intersected multiple polymetallic intervals and confirmed the presence of a polyphase silver-lead-zinc-antimony vein system.
In addition, the IP anomaly beneath the Silver Cord Mine is interpreted as intense siliceous alteration and anomalous copper consistent with intrusive-related hydrothermal activity. Based on these encouraging results, King is planning the next phase of drilling at Silver Cord to begin in Q1 2026.
Howard Copper Mine
Revitalizing an Arizona Copper Icon
The Howard Copper Mine, a historic high-grade copper producer, is set to become a key growth driver for King Global Critical Minerals. Located just 10 miles southeast of the Black Canyon project, the Howard Mine is a testament to the rich copper endowment of the region, with past production of approximately 100,000 tonnes of ore grading between 3% and 5% copper.
Our team is currently conducting a comprehensive technical review of the Howard Mine, including detailed mapping, sampling, and 3D modeling of the historic workings. This work will form the basis for a targeted exploration program aimed at expanding known zones of high-grade copper mineralization and discovering new deposits within this extensively mineralized corridor.
- Leadership
John Cook (CEO, Outgoing CEO and director of King, with significant experience in the mining sector.), Jeff Ivan (President, Accomplished professional in the Agri-minerals business with over 20 years of experience in international markets.), Victor Hugo (CFO, CPA and CMA with over 20 years of experience in the mining and manufacturing sectors, specializing in accounting and financial reporting.), Robert Dzisiak (CEO, Experienced executive with a background in managing large organizations and public market experience.)
Verified data last updated:
Recent filings
Investor FAQ
The most recent document in the index is dated 2026-10-29 (KING:CNX_2026-10-29_15-53-15.pdf, type other), with the latest press release dated 2026-10-13 and the latest material change report dated 2026-09-30. The index also includes a press release dated 2026-09-28 titled King Reports Name Change. The content of these documents is not included in the verified company data, so the specific news items cannot be described beyond their dates and titles.
The verified company data states that a Phase 2 drill program was planned for October 2025 to drill out gravity survey anomalies, and the Silver Cord profile states that next-phase drilling was planned to begin in Q1 2026, though it also reports that the Phase 2 Silver Cord drilling was completed in February 2026. Other planned items include permits pending with the National Forest for the Golden Turkey and Golden Belt properties and a Joint Venture agreement with Security Minerals Corp. Specific dated upcoming catalysts beyond these are not disclosed in available filings.
Answers last refreshed: