ESGold logo

ESGold

CSE:ESAULive AI agent

Investor website: https://esgold.com/

About

ESGold Corp. is a Canadian mining company focused on advancing the Montauban Gold-Silver Project in Québec, which is a fully permitted tailings reprocessing operation aimed at generating near-term production while supporting long-term exploration in the Montauban district. The project is situated in a historic polymetallic mining camp known for past production of gold, silver, zinc, and lead. ESGold's strategy integrates near-term production from historic tailings with district-scale exploration, leveraging modern geological modeling that indicates a larger gold-silver system beneath the historic workings. The Montauban site benefits from strong infrastructure, hydroelectric power access, and a rich mining history.

Verified company data

Cash position
$14,921
Shares outstanding
111,521,090
Fully diluted shares
155,088,007
Mineral resource

The Montauban mining district has a long history of polymetallic production. Historic mining operations produced significant quantities of zinc, lead, gold, and silver. The tailings mineral resources are categorized as follows: Indicated - 603,700 tonnes with 0.40 g/t Au and 31.45 g/t Ag; Inferred - 319,300 tonnes with 0.41 g/t Au and 36.93 g/t Ag. Recoverable metal includes 6,950 oz gold (Indicated), 470,050 oz silver (Indicated), 3,800 oz gold (Inferred), and 291,200 oz silver (Inferred). The mica by-product resource includes Anacon Lead 1 with 571,900 tonnes at 9% mica (51,500 tonnes) and Tetreault 2 with 142,900 tonnes at 4% mica (5,700 tonnes), totaling 714,800 tonnes and approximately 57,200 tonnes of mica.

Projects

The Montauban Project is ESGold’s flagship gold-silver development asset located in Québec, Canada. The project is designed as a fully permitted tailings-to-cash operation, recovering gold, silver, and mica from historic mine tailings while advancing district-scale exploration potential across the surrounding Montauban mining camp. The project is advancing toward near-term gold and silver production and is supported by completed infrastructure, strong Preliminary Economic Assessment economics, and a newly defined geological model indicating a much larger mineralized system beneath the historic mine footprint. Fully permitted and fully funded to commissioning and first production. Mill building completed with 1,000 tonnes per day processing capacity. Expanded ANT-2 survey and updated property-scale 3D geological model completed across approximately 70 km². Integrated geological database includes 1,637 drillholes and 1,707 regional multi-element samples. Expanded land position to 485 claims covering approximately 244 km² (24,414 hectares). Montauban combines near-term production from historic tailings with district-scale exploration upside, creating a development pathway that can generate cash flow while expanding the broader mineral system.

Leadership

Gordon Robb (CEO & Director, Chief Executive Officer of ESGold Corp. with extensive experience in mining and corporate governance.), Jason Tong (CFO, CPA, CA, CFA with over 15 years of experience in financial leadership roles across TSX, TSXV, and Nasdaq exchanges.), Pierre-Marc Gagnon (Operations Director, P.Eng. with diverse operational and technical experience in mining, including hands-on involvement in underground mine development and project coordination.)

Verified data last updated:

Recent filings

Investor FAQ

Answers last refreshed: