
About
Eastplats, headquartered in Vancouver, is a mid-tier producer of platinum group metals (PGM) and chrome, focusing on organic growth through its projects in the Bushveld Complex. The company is listed on the Toronto Stock Exchange (TSX:ELR) and the Johannesburg Stock Exchange (JSE:EPS). Eastplats is committed to sustainable value creation for shareholders, employees, and host communities, emphasizing safety, social governance, and environmental responsibility. The company upholds high standards of corporate governance and has a dedicated management team.
Verified company data
- Cash position
- $1.2 million
- Shares outstanding
- 201,901,426
- Fully diluted shares
- 209.4 M
- Mineral resource
Classified Resources for the LC2 To U2MC Reef, as at December 2010
Width SG Million<br>Tonnes 3PGE+Au 3PGE+Au<br>Million<br>Ounces 5PGE+Au Pt Pd Rh Au --- --- --- --- --- --- --- --- --- --- --- Measured Boschkloof 1.50 3.88 20.90 5.13 3.45 6.11 2.70 1.83 0.55 0.06 De Goedeverwachting 1.49 3.93 28.60 5.20 4.79 6.22 2.81 1.81 0.53 0.06 Kennedy’s Vale 1.50 3.82 42.30 4.43 6.03 5.31 2.36 1.57 0.45 0.05 Spitzkop 1.48 3.81 41.80 5.21 7.00 6.26 2.83 1.83 0.48 0.07 Total 1.49 3.85 133.60 4.95 21.30 5.93 2.65 1.75 0.49 0.06 Indicated Belvedere 1.5 3.8 15.3 3.94 1.9 4.72 2.1 1.4 0.4 0.05 Boschkloof 1.5 3.9 13.8 4.84 2.2 5.81 2.6 1.7 0.5 0.06 Kennedy’s Vale 1.5 3.8 21.5 4.15 2.9 5 2.3 1.4 0.4 0.05 Tweefontein 1.48 3.9 3.1 4.43 0.4 5.27 2.4 1.6 0.5 0.05 Total 1.5 3.8 53.8 4.28 7.4 5.15 2.3 1.5 0.4 0.05 Total Measured and Indicated 1.49 3.9 187.4 4.76 28.7 5.7 2.6 1.7 0.5 0.05 Inferred Belvedere 1.5 3.8 51.3 4.71 7.8 5.59 2.4 1.7 0.5 0.05 Boschkloof 1.5 3.8 2.9 4.52 0.4 5.43 2.4 1.6 0.4 0.06 Tweefontein 1.49 3.8 20.9 4.58 3.1 5.43 2.4 1.7 0.5 0.05 Total Inferred 1.5 3.8 75.1 4.67 11.3 5.54 2.4 1.7 0.5 0.05 Classified Resources for the separate Merensky Reef, as at December 2010
Width SG Million<br>Tonnes 3PGE+Au 3PGE+Au<br>Million<br>Ounces 5PGE Au Pt Pd Rh Au --- --- --- --- --- --- --- --- --- --- --- Measured Boschkloof 2.51 3.3 16.26 2.3 1.2 2.53 1.4 0.7 0.1 0.14 De Goedeverwachting 2.53 3.3 36.75 2.35 2.78 2.56 1.4 0.8 0.1 0.16 Kennedy’s Vale 2.50 3.3 59.22 2.79 5.3 3.04 1.6 0.9 0.1 0.17 Spitzkop 2.49 3.2 48.92 2.53 3.98 2.77 1.4 0.8 0.1 0.19 Totals 2.5 3.3 161.15 2.56 13.26 2.79 1.5 0.8 0.1 0.17 Indicated Belvedere 2.47 3.3 24.33 3.98 3.11 4.34 2.2 1.4 0.2 0.23 Boschkloof 2.51 3.3 30.89 2.65 2.63 2.9 1.5 0.9 0.1 0.15 De Goedeverwachting 2.48 3.3 0.98 2.42 0.08 2.62 1.4 0.8 0.1 0.17 Kennedy’s Vale 2.49 3.3 25.91 3.62 3.01 3.95 2 1.3 0.2 0.21 Tweefontein 2.53 3.3 5.95 3.52 0.67 3.83 2 1.2 0.1 0.2 Totals 2.5 3.3 88.06 3.36 9.5 3.67 1.9 1.1 0.1 0.2 Total Measured and Indicated 2.5 3.3 249.21 2.84 22.8 3.1 1.6 0.9 0.1 0.18 Inferred Belvedere 2.52 3.3 64.47 3.04 6.31 3.31 1.7 1 0.1 0.17 Boschkloof 2.61 3.3 3.33 3.07 0.33 3.35 1.7 1.1 0.1 0.18 Tweefontein 2.5 3.3 26.28 3.5 2.96 3.81 2 1.2 0.1 0.2 Total Inferred 2.52 3.3 94.08 3.17 9.6 3.45 1.8 1.1 0.1 0.18 - Projects
Crocodile River Mine (CRM): CRM, which is currently the most advanced of our assets, is located within the Brits Graben, where the UG2 typically consists of a single chromite layer some 1.35m to 1.5m thick. The Crocodile River operation currently has a mine lease area covering 2,700 hectares and comprises an operating reclaiming section on the tailings dam, Zandfontein underground; two development sections, Crocette and Kareespruit; and a number of processing plants. The Zandfontein underground mine has a life of mine of more than 22 years and 1.7 million ounces of 4E PGM mineral reserves, with a potential production of 50,000 ounces per year. History: CRM has been in operation since 1987, when the decline development at the Zandfontein section commenced and the mine was listed on the Johannesburg Stock Exchange. Mining operations were suspended in 1991 due to a decline in PGM prices. The mine was again brought back into production in 2000 before being placed on care and maintenance in 2003. The following year, limited mining activities were undertaken, and the stoping sections were refurbished. In 2005, drilling and blasting resumed, as well as dewatering and shaft rehabilitation, beginning in 2008. In 2012, the eastern limb projects, including Mareesburg and Kennedy’s Vale/Spitzkop, were placed on care and maintenance and then in 2013, a decision was taken to place the Zandfontein and Crocette mines under care and maintenance owing to the global economic outlook and weaker PGM pricing at the time. Chrome reclamation began in December 2018 from the retreatment project of the Zandfontein tailings with PGMs reclamation beginning later in 2020. Following significant improvements in the PGM market and a cost-effective re-design of the mining methodology, Eastplats announced that it will restart underground mining at CRM. The initial restart of the Zandfontein underground is fully funded and will begin with re-support tunnel work. The project is expected to yield high-grade PGM concentrate produced from the UG2 Chromite Layer, which will be transported to the Impala Smelter Complex near Rustenburg in terms of an offtake agreement between the parties.
Zandfontein Underground: As part of Eastplats’ development strategy for CRM, it is preparing to restart mining at the Zandfontien underground with the first production expected in 2024. Previously, Zandfontein was placed in care and maintenance due to the economics of the operation at the time. In 2021, an underground life of mine study and design was completed by the mining consulting group Ukwazi and Minxcon was commissioned to complete a Technical Report and valuation of Zandfontein. The re-design of the Zandfontein underground will contribute to a profitable and sustainable operation going forward. The highlights of the changes in the design and operating principles are as follows: | Aspect | Previous operations | New design | Advantage | | --- | --- | --- | --- | | In-stope Drilling | Handheld with compressed air | Handheld with hydro power | - More effective power<br>- Higher penetration<br>- Reduced noise<br>- Reduced heat generation | | Support | - Sticks<br>- 1.8m roofbolts<br>- Packs<br>- Pillars | - Timberless<br>- 2.0m cable anchors<br>- Packs<br>- Pillars | - Reduced logistics<br>- Reduced material handling<br>- Reduced cost | | Development | in footwall, 30m below reef | Development on reef | - Reduces hoisting<br>- Cost saving<br>- Generates revenue | | Faults | Single operation with development through large faults with single vent district | Operation with three distinct zones with their own infrastructure | - Flexibility<br>- Reduced risk of development through faults<br>- Three vent districts | | Infrastructure | Shaft loading and logistic arrangements and conveyors not fully commissioned | Conveyors, chairlift and vertical shaft fully functional | - Increased efficiencies<br>- Lower Cost<br>- Reduced load and haul fleet<br>- Reduced emissions |
Zandfontein Tailings Retreatment Project: Eastplats started design work and construction preparation in 2017 to re-mine the tailings storage facility to produce chrome concentrates at the Zandfontein Retreatment Project. In 2018 Eastplats and its subsidiary Barplats Mines (Pty) Limited agreed with Union Goal Offshore Solution Limited to provide for the construction, mining and processing of the tailings, and the subsequent offtake of chrome concentrate, from the Retreatment Project. Union Goal financed and sourced the chrome processing circuit, related technology and know-how while Barplats is responsible for the development, mining and operations of the Retreatment Project. The Chrome Circuit uses magnetic separation technology to improve the recovery of chrome concentrate from tailings compared to traditional spiral technology, which was to be mined by a hydro / mechanical method. This resulted in the economical re-mining and treatment of the entire resource of 13.68 million tonnes with better chrome recoveries and increased the life of the project from 33 months to over 60 months. In Q4 2020, Eastplats commissioned PGM Circuit D to produce PGM concentrates from part of the tails following the chrome production. Work commenced on PGM Circuit B in May 2021 and the circuit was commissioned in October 2021. The chrome and PGM expansion were completed in 2022. Completion of the optimization program on the chrome circuit is contingent on receipt of payments from Union Goal required to fund the remainder of commissioning and testing. Previously, and until the end of the second quarter of 2022, the Retreatment Project produced revenue based on tons of material made available for processing by remining and processing the tailings, recovery of certain operational costs and allocation of the upfront cash payment for the offtake of chrome concentrate to Union Goal. Additional non-cash deferred revenue was recognized based on tons made available for processing from the discounting of the chrome equipment debt and the construction loan based on an effective discount rate. Although the Union Goal Offtake Agreement remains in place, Union Goal stopped taking shipments of chrome concentrate in June 2022. Chrome revenue after this point has been generated only through third-party sales of chrome concentrate. The Company also earns PGM revenue under a PGM offtake agreement with Impala from further processing of tailings materials following the production of chrome concentrates.
- Leadership
Changyu (Charlie) Liu (Interim Chief Executive Officer, Mr. Liu is the Chairman of Ka An Development Co. Limited, focusing on business investments and international trade. He has over two decades of expertise in business investment and financing.), Xinneng (David) Li (Chief Financial Officer and Corporate Secretary, Mr. Li is a highly experienced financial executive with over 25 years of international leadership experience across various sectors, including mining. He holds an MBA and is a CPA in Canada and the U.S.)
Verified data last updated:
Recent filings
- News release
- EASTERN PLATINUM LIMITED REPORTS RESULTS FOR THE THIRD QUARTER OF 2026 · EASTERN PLATINUM LIMITED REPORTS RESULTS FOR THE THIRD QUARTER OF 2026 (QuoteMedia 8656323099772126)
- 52-109F2 - Certification of interim filings - CFO (E)
- 52-109F2 - Certification of interim filings - CEO (E)
- MD&A
- Interim financial statements/report
- EASTERN PLATINUM LIMITED REPORTS RESULTS FOR THE SECOND QUARTER OF 2026 · EASTERN PLATINUM LIMITED REPORTS RESULTS FOR THE SECOND QUARTER OF 2026 (QuoteMedia 8954316343326386)
- 52-109F2 - Certification of interim filings - CFO (E)
Investor FAQ
The most recent item in the document index is an elr_2026-11-16_11-36-40.pdf document dated 2026-11-16, though its content is not described in the available data. The latest titled press release is Eastern Platinum Limited's report of results for the third quarter of 2026, dated 2026-11-14. Specific figures from these documents are not included in the verified company data provided.
Per the verified company data, the Zandfontein underground restart at the Crocodile River Mine is expected to produce first output in 2024, with the initial restart described as fully funded and beginning with re-support tunnel work. Completion of the optimization program on the chrome circuit of the Zandfontein Retreatment Project is contingent on receipt of payments from Union Goal required to fund the remainder of commissioning and testing. Specific dates for these events beyond the figures stated are not disclosed in available filings.
Answers last refreshed: