
About
Bravo Mining Corp. (TSX.V: BRVO, OTCQX: BRVMF) is a Canadian- and Brazil-based mineral exploration and development company advancing its flagship Luanga PGM + Au + Ni Project in the world-class Carajás Mineral Province of Brazil. Luanga is a multi-million-ounce, Tier 1 deposit, with a Mineral Resource of 10.4 Moz PdEq Measured & Indicated and 5.0 Moz PdEq Inferred, supporting a robust PEA outlining an NPV (8%) of US$1.25B (Base Case) and US$1.86B (Alternate Case). The Company is well-funded to execute its growth plans and is advancing toward a PFS targeted for Q3 2026. The project benefits from exceptional infrastructure access, including renewable hydropower, road, rail, and port connectivity. In parallel, Bravo is advancing a growing IOCG-style copper-gold opportunity, further enhancing long-term value potential.
Verified company data
- Cash position
- $77,135,302
- Shares outstanding
- 129978944
- Fully diluted shares
- 144303454
- Mineral resource
Highlights of Bravo’s 2025 Updated Mineral Resource Estimate (“MRE”) at a 0.50 g/t PdEq cut-off grade
- Measured + Indicated resources total 158 million tonnes (“Mt”) grading 2.04 grams per tonne (“g/t”) PdEq1, for a total of 10.4 Moz of PdEq1 contained.
The MRE introduces Measured mineral resource for the first time. The combined Measured + Indicated tonnes have improved by 117% as compared to the Indicated tonnes in the 2023 MRE, while grade has improved by 17%, resulting in a 154% increase in contained PdEq1 ounces.
- Inferred Resources of 78 Mt grading 2.01 g/t PdEq1 for 5.0 Moz PdEq1.
Tonnes of Inferred resources decreased, as most of previous Inferred tonnages were reclassified to higher-confidence categories while new Inferred resources were added beyond the limits of the prior MRE, and grades improved by 34% in the Inferred category.
- Measured & Indicated Resources now make up 67% of total MRE, a significant improvement from the 2023 MRE where 38% of the mineral resource was in the Indicated category.
- Relative percentages of each metal by PdEq 1 value contribution to the MRE, are estimated at: 47% Pd, 25% Pt, 13% Rh, 13% sulphide Ni, and 2% Au.
- 2025 MRE outcome was achieved using the same metal prices as the prior MRE, somewhat more conservative metallurgical recoveries and otherwise similar modifying factors.
- The MRE remains open at depth along the 8.1km strike of the deposit, with many of the areas below current drilling depths are considered within potential open pit extraction depths.
Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no certainty that all mineral resources will be converted into mineral reserves.
The MRE has been prepared by Bernardo Horta de Cerqueira Viana, Geologist, BSc (Geology), FAIG, CEO of GE21 Consultoria Mineral Ltda. and Porfírio Cabaleiro Rodriguez, Mining Engineer, BSc (Mine Eng), FAIG, CKO of GE21 Consultoria Mineral Ltda., both independent Qualified Person (“ QP”) under National Instrument 43-101 Standards of Disclosure for Mineral Projects (“ NI 43-101”). The effective date of the MRE is 18 February 2025
- Projects
Luanga PGM+Au+Ni Project
Location & Infrastructure
Luanga location enjoys excellent infrastructure and access through paved highway and unpaved roads. The project is comprised of a 7,810 hectares mining exploration licence.
Luanga is accessible via paved and unpaved roads from two regional centres, Parauapebas and Marabá. Both cities have commercial airports with multiple flights a day to Brasilia and Belém from Parauapebas and to Brasilia, São Paulo, Rio de Janeiro, Salvador and others from Marabá. Access to the Project is via a high-quality unpaved road that turns off paved Highway PA-257.
There is a high voltage 138kV low cost (US$0.10/kWh) hydro grid power within 20km of the Project. Luanga is ~45km NNE distant from the city of Parauapebas (Pop. ~200,000); mining capital of Pará and regional centre for mining services and logistics.
- Luanga Project Highlights
- Location & Infrastructure
- Geology & Mineralization
- Technical Reports
- Mineral Resource Estimate
- Maps & Figures
Luanga PGM+Au+Ni Project
Mineral Resource Estimate
Highlights of Bravo’s 2025 Updated Mineral Resource Estimate (“MRE”) at a 0.50 g/t PdEq cut-off grade
- Measured + Indicated resources total 158 million tonnes (“Mt”) grading 2.04 grams per tonne (“g/t”) PdEq1, for a total of 10.4 Moz of PdEq1 contained.
The MRE introduces Measured mineral resource for the first time. The combined Measured + Indicated tonnes have improved by 117% as compared to the Indicated tonnes in the 2023 MRE, while grade has improved by 17%, resulting in a 154% increase in contained PdEq1 ounces.
- Inferred Resources of 78 Mt grading 2.01 g/t PdEq1 for 5.0 Moz PdEq1.
Tonnes of Inferred resources decreased, as most of previous Inferred tonnages were reclassified to higher-confidence categories while new Inferred resources were added beyond the limits of the prior MRE, and grades improved by 34% in the Inferred category.
- Measured & Indicated Resources now make up 67% of total MRE, a significant improvement from the 2023 MRE where 38% of the mineral resource was in the Indicated category.
- Relative percentages of each metal by PdEq 1 value contribution to the MRE, are estimated at: 47% Pd, 25% Pt, 13% Rh, 13% sulphide Ni, and 2% Au.
- 2025 MRE outcome was achieved using the same metal prices as the prior MRE, somewhat more conservative metallurgical recoveries and otherwise similar modifying factors.
- The MRE remains open at depth along the 8.1km strike of the deposit, with many of the areas below current drilling depths are considered within potential open pit extraction depths.
Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no certainty that all mineral resources will be converted into mineral reserves.
The MRE has been prepared by Bernardo Horta de Cerqueira Viana, Geologist, BSc (Geology), FAIG, CEO of GE21 Consultoria Mineral Ltda. and Porfírio Cabaleiro Rodriguez, Mining Engineer, BSc (Mine Eng), FAIG, CKO of GE21 Consultoria Mineral Ltda., both independent Qualified Person (“ QP”) under National Instrument 43-101 Standards of Disclosure for Mineral Projects (“ NI 43-101”). The effective date of the MRE is 18 February 2025
Technical Report
Independent Technical Report on Updated Mineral Resources Estimate for the Luanga PGM+Au+Ni Project – April 2, 2025
- Leadership
Simon Mottram (President, Over 32 years of experience in mining, with a strong track record of exploration success and multiple discoveries through to commercial production.), Manoel Carlos Cerqueira (CFO, Over 35 years of experience in senior management positions in the mining sector.), Paulo Ilidio de Brito (VP Exploration, BSc geologist with over 37 years of experience in the mining industry.), Heinrich Muller (VP Technical Services, Mining executive with over 18 years of experience across the resources value chain.), Alex Penha (EVP Corporate Development, Over 20 years of experience in Canadian capital markets focused on junior mining companies.), Fabio Masotti (Leader Copper-Gold Division, Over 30 years of Brazilian and international experience in mineral exploration across more than 20 countries.), Luis Azevedo (Executive Chairman & CEO, Over 35 years of international experience in the resource industry and expertise in the Brazilian Mining Code.), Anthony (Tony) Polglase (Lead Director, Over 40 years of international experience in multiple mining disciplines.), Stephen Quin (Independent Director, Over 45 years of experience in exploration, development, operations, and closure in the mining sector.), Margot Naudie (Independent Director, Over 25 years of global investment experience managing natural resource portfolios.)
Verified data last updated:
Recent filings
- News release
- Interim financial statements/report
- Bravo Announces Filing of Pre-Feasibility Study (PFS) Technical Report for its 100% Owned Luanga Project · Bravo Announces Filing of Pre-Feasibility Study (PFS) Technical Report for its 100% Owned Luanga Project (QuoteMedia 7585223018196157)
- Consent of qualified person (NI 43-101)
- Technical report (NI 43-101)
- Consent of qualified person (NI 43-101)
- News release
- Bravo Announces Appointment of KPMG Brazil as Auditor · Bravo Announces Appointment of KPMG Brazil as Auditor (QuoteMedia 6057109967255404)
Investor FAQ
The most recent indexed document is a press release dated 2026-11-16. Earlier recent items include the 2026-11-05 announcement of the filing of the Pre-Feasibility Study (PFS) Technical Report for the 100% owned Luanga Project, and the 2026-10-02 announcement of the appointment of KPMG Brazil as auditor. The content of the 2026-11-16 press release is not described in the available verified data.
Bravo Mining's flagship asset is the Luanga PGM+Au+Ni Project in the Carajás Mineral Province of Brazil, covering a 7,810 hectare mining exploration licence. The 2025 updated Mineral Resource Estimate, effective 18 February 2025, reports 10.4 Moz PdEq Measured & Indicated and 5.0 Moz PdEq Inferred at a 0.50 g/t PdEq cut-off grade. The project benefits from access via paved highway and unpaved roads, a 138kV hydro grid power connection within 20km at approximately US$0.10/kWh, and proximity to Parauapebas, about 45km away. A PFS technical report was filed on 2026-11-05, with the Company also advancing a copper-gold IOCG-style opportunity.
Answers last refreshed: