Bravo Mining Corp. (TSX.V: BRVO, OTCQX: BRVMF) is a Canadian- and Brazil-based mineral exploration and development company advancing its flagship Luanga PGM + Au + Ni Project in the world-class Carajás Mineral Province of Brazil. Luanga is a multi-million-ounce, Tier 1 deposit, with a Mineral Resource of 10.4 Moz PdEq Measured & Indicated and 5.0 Moz PdEq Inferred, supporting a robust PEA outlining an NPV (8%) of US$1.25B (Base Case) and US$1.86B (Alternate Case). The Company is well-funded to execute its growth plans and is advancing toward a PFS targeted for Q3 2026. The project benefits from exceptional infrastructure access, including renewable hydropower, road, rail, and port connectivity. In parallel, Bravo is advancing a growing IOCG-style copper-gold opportunity, further enhancing long-term value potential.
Verified company data
- Cash position
- $94,068,036
- Shares outstanding
- 137054988
- Fully diluted shares
- 144303454
- Mineral resource
Highlights of Bravo’s 2025 Updated Mineral Resource Estimate (“MRE”) at a 0.50 g/t PdEq cut-off grade
- Measured + Indicated resources total 158 million tonnes (“Mt”) grading 2.04 grams per tonne (“g/t”) PdEq1, for a total of 10.4 Moz of PdEq1 contained.
The MRE introduces Measured mineral resource for the first time. The combined Measured + Indicated tonnes have improved by 117% as compared to the Indicated tonnes in the 2023 MRE, while grade has improved by 17%, resulting in a 154% increase in contained PdEq1 ounces.
- Inferred Resources of 78 Mt grading 2.01 g/t PdEq1 for 5.0 Moz PdEq1.
Tonnes of Inferred resources decreased, as most of previous Inferred tonnages were reclassified to higher-confidence categories while new Inferred resources were added beyond the limits of the prior MRE, and grades improved by 34% in the Inferred category.
- Measured & Indicated Resources now make up 67% of total MRE, a significant improvement from the 2023 MRE where 38% of the mineral resource was in the Indicated category.
- Relative percentages of each metal by PdEq 1 value contribution to the MRE, are estimated at: 47% Pd, 25% Pt, 13% Rh, 13% sulphide Ni, and 2% Au.
- 2025 MRE outcome was achieved using the same metal prices as the prior MRE, somewhat more conservative metallurgical recoveries and otherwise similar modifying factors.
- The MRE remains open at depth along the 8.1km strike of the deposit, with many of the areas below current drilling depths are considered within potential open pit extraction depths.
Mineral resources that are not mineral reserves do not have demonstrated economic viability. There is no certainty that all mineral resources will be converted into mineral reserves.
The MRE has been prepared by Bernardo Horta de Cerqueira Viana, Geologist, BSc (Geology), FAIG, CEO of GE21 Consultoria Mineral Ltda. and Porfírio Cabaleiro Rodriguez, Mining Engineer, BSc (Mine Eng), FAIG, CKO of GE21 Consultoria Mineral Ltda., both independent Qualified Person (“ QP”) under National Instrument 43-101 Standards of Disclosure for Mineral Projects (“ NI 43-101”). The effective date of the MRE is 18 February 2025.
- Projects
Luanga PGM+Au+Ni Project
Luanga Project Highlights
One of the largest undeveloped open-pit PGM projects globally
- 100% owned PGM + Au + Ni project in the Carajás Mineral Province, Brazil
- Well-balanced basket with precious and critical minerals: Palladium, Platinum, Rhodium, Nickel, and Gold + Copper-Gold potential
- Large-scale, multi-million-ounce resource supporting a long-life open-pit operation
- One of the largest undeveloped shallow PGM deposits globally
- Strong economics with high margins and low CAPEX-to-NPV ratio
- Exceptional infrastructure advantage: access to low-cost hydropower, roads, rail, water, skilled labour, and potential tax incentives
Scale & Resource Quality1
- 10.4 Moz PdEq (M&I) + 5.0 Moz PdEq (Inferred)
- 158 Mt @ 2.04 g/t PdEq (M&I) | 78 Mt @ 2.01 g/t PdEq (Inferred)
- 67% Measured & Indicated (high confidence)
- Nickel sulphides: ~195 kt (M&I) + ~98 kt (Inferred)
- Based on 108,000+ metres of drilling (531 holes)
Open-Pit Advantage & Growth1
- 86% of total tonnage within 250m of surface
- Strong pit-constrained resource profile
- Mineralization remains open at depth and along strike
Metallurgy & Processing1
- Extensive testwork completed
- Demonstrated potential to produce marketable PGM + Au + Ni concentrates
Strong Economics – Preliminary Economic Assessment (PEA – 2025) 1
Based on 4E (Pd, Pt, Rh, Au) PGM Basket Price of $1,555
Base Case (Concentrate Sales)
- NPV8%: US$1.25B | IRR: 49% - Initial CAPEX: ~US$496M - Payback: 2.4 years - AISC: ~US$638/oz PdEq Alternate Case (Vertical Integration)
- NPV8%: US$1.86B | IRR: 49% - Initial CAPEX: ~US$678M - Payback: 2.4 years - AISC: ~US$697/oz PdEq Strategic Upside – ZPE & Vertical Integration
- Luanga selected as anchor project in the recently created Barcarena Export Processing Zone (ZPE)
- Access to 271 ha industrial zone at Port of Vila do Conde
- Benefits: Advantages in the form of fiscal and taxation benefits
- Enables value-added processing and export advantages
- Potential sulphuric acid by-product revenue (PEA assumption: US$160/t vs. current market significantly higher)
- Strengthens the case for downstream integration and margin expansion
Copper-Gold Optionality
- Established Copper-Gold division targeting IOCG systems
- Focused on exploration and potential acquisitions within Carajás
- Adds meaningful long-term growth optionality beyond core PGM asset
Location & Infrastructure
- Located ~40 km from Parauapebas, a major mining hub
- Access to roads, rail, port, and low-cost renewable hydropower
- Simple land position with full surface access agreements
- No nearby communities or indigenous land constraints
People – Proven Track Record
- ~45% insider ownership (Board & Management)
- Team with end-to-end mine-building experience
- Proven success in Carajás (Avanco → OZ Minerals acquisition)
- Strong expertise in PGMs, nickel sulphides, and capital markets
ESG & Sustainability
- Located on previously degraded land (deforested ~40 years ago)
- Reforestation program (10 trees planted per drill hole)
- Potential for carbon capture in ultramafic rocks (under study)
- Powered by renewable hydroelectric energy
- Strong focus on local hiring and community development
- Supporting youth and community programs (>300 beneficiaries) focused on education, sports, and social development
(1) All scientific and technical information relating to the Mineral Resource Estimate (“MRE”) of the Luanga Project contained in this presentation is derived from Bravo’s Technical Report, titled “NI 43-101 Independent Technical Report, Luanga PGM + Au + Ni Project Pará State, Brazil”, dated February 18, 2025, with an issue date of April 2, 2025. All scientific, production estimates, project economics and technical information relating to the Preliminary Economic Assessment (“PEA”) of the Luanga Project contained in this presentation is derived from Bravo’s Technical Report, titled “NI 43-101 Preliminary Economic Assessment (PEA) Independent Technical Report for the Luanga PGM + Au + Ni Project Pará, Brazil”, dated July 7, 2025, with an issue date of August 20, 2025. Both report are filed on SEDAR+.
- Leadership
Simon Mottram (President, Over 32 years of experience in mining, with a strong track record of exploration success and executive roles in various mining companies.), Manoel Carlos Cerqueira (CFO, Over 35 years of experience in senior management positions in the mining sector.), Paulo Ilidio de Brito (VP Exploration, BSc geologist with over 37 years of experience in the mining industry.), Heinrich Muller (VP Technical Services, Mining executive with over 18 years of experience across the resources value chain.), Alex Penha (EVP Corporate Development, Over 20 years of experience in Canadian capital markets focused on junior mining companies.), Fabio Masotti (Leader Copper-Gold Division, Mineral exploration executive with over 30 years of experience across more than 20 countries.)
Verified data last updated:
Recent filings
- News release
- Interim financial statements/report
- Bravo Announces Filing of Pre-Feasibility Study (PFS) Technical Report for its 100% Owned Luanga Project · Bravo Announces Filing of Pre-Feasibility Study (PFS) Technical Report for its 100% Owned Luanga Project (QuoteMedia 7585223018196157)
- Consent of qualified person (NI 43-101)
- Technical report (NI 43-101)
- Consent of qualified person (NI 43-101)
- News release
- Bravo Announces Appointment of KPMG Brazil as Auditor · Bravo Announces Appointment of KPMG Brazil as Auditor (QuoteMedia 6057109967255404)
Investor FAQ
The most recent document in the index is a press release dated 2026-11-16 (brvo_2026-11-16_11-37-13.pdf), and a financials filing dated 2026-11-13. Earlier in the period, Bravo announced on 2026-11-05 the filing of the Pre-Feasibility Study (PFS) Technical Report for its 100% owned Luanga Project, and on 2026-10-02 the appointment of KPMG Brazil as auditor. The content of the 2026-11-16 press release is not described in the available index summary.
Bravo Mining's flagship asset is the 100% owned Luanga PGM + Au + Ni Project in the Carajás Mineral Province of Brazil. The 2025 Updated Mineral Resource Estimate, effective 18 February 2025, reports 10.4 Moz PdEq Measured & Indicated (158 Mt at 2.04 g/t PdEq) and 5.0 Moz PdEq Inferred (78 Mt at 2.01 g/t PdEq), and the 2025 PEA reports an NPV (8%) of US$1.25B in the Base Case and US$1.86B in the Alternate Case. The Company is advancing toward a PFS targeted for Q3 2026, and a PFS Technical Report was filed on 2026-11-05.