Bunker Hill Mining Corp logo

Bunker Hill Mining Corp

TSX:BNKRLive AI agent

Investor website: https://www.bunkerhillmining.com/

About

Bunker Hill is positioned as a new champion in U.S. silver and critical minerals, focusing on near-term silver production and high-grade exploration assets. The company aims to rebuild America’s silver supply through a diverse portfolio of projects that include production, development, and exploration. With a 100% U.S. asset base, Bunker Hill combines imminent cash-flow opportunities with a robust development pipeline. The company is listed on the TSX and is pursuing a listing on the NYSE American, along with a proposed name change to Bunker Hill Silver Corp. Bunker Hill's market cap is approximately $117.2 million, and it has a clear production path aiming for over 5 million ounces of silver equivalent annually. The company boasts a top-tier silver resource base with significant growth potential and is supported by an experienced team and established relationships with U.S. government entities for project financing and permitting.

Verified company data

Cash position
US $34M
Shares outstanding
83.7M
Fully diluted shares
117.1M
Mineral resource

INFERRED

168.6M AgEq

Contained within 15.6 Mt

336 g/t AgEq

  • Grade: Both Resource zones host multiple intercepts over 2,000 g/t AgEq*
  • Scale: Only 2 out of 35 mineralized prospects across a 60 km trend have seen systematic exploration
  • Current Resource based less than 40,000 meters of drilling
  • Over $30M(CAD) spent in historical exploration

Equivalencies are calculated using ratios with metal prices of US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag and recoveries of 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au. AgEq* (g/t) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (g/t) x 1] + [Au (g/t) x 91.93]

Projects

Mogollon Project

New Mexico, USA

About Mogollon

The Mogollon Project is located 120 km from Silver City in southwestern New Mexico, the largest historic silver producing region in the state. It covers an extensive, silver-gold bearing epithermal vein field. Between 1904 and 1925 the district is reported to have produced 13.1M ounces of Silver and 271k ounces of Gold from 1.39M tons of rock¹. Production stopped in 1942 due to the wartime cessation of all gold and silver mining in the United States, but the established workforce and infrastructure remain.

Sources: USGS 1927, Blackhawk Mines corporate production records 1942

Project Highlights

INFERRED

168.6M AgEq

Contained within 15.6 Mt

336 g/t AgEq

  • Grade: Both Resource zones host multiple intercepts over 2,000 g/t AgEq*
  • Scale: Only 2 out of 35 mineralized prospects across a 60 km trend have seen systematic exploration
  • Current Resource based less than 40,000 meters of drilling
  • Over $30M(CAD) spent in historical exploration

Equivalencies are calculated using ratios with metal prices of US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag and recoveries of 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au. AgEq* (g/t) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (g/t) x 1] + [Au (g/t) x 91.93]

Qualified Person under NI 43-101

Galen McNamara, P.Geo., the President & CIO of the Company, and a qualified person pursuant to NI 43-101, has reviewed and approved the scientific and technical information contained on this website. Mr. McNamara has verified the data disclosed herein, including sampling and drilling data underlying the technical information contained herein, by reviewing blanks, duplicates and certified reference material that the Company inserted into the sample stream and confirming that they fall within limits as determined by acceptable industry practice.

Technical Report

Mogollon Silver-Gold Exploration Property Technical Report

Effective Date: November 22, 2024

Hughes Project

Nevada, USA

About Hughes

Discovered in 1900, Tonopah quickly became known as the Queen of the Silver Camps, with people from all over the country rushing to Nevada in hopes of making their fortunes. Over the next half century, the Tonopah district produced 175 million ounces of silver and 1.86 million ounces of gold from 8.8 million tons of rock. Today, the existing infrastructure supports mineral exploration and development in the well-established historic mining district.

Historic Production Source: United States Geological Survey, 2018

Project Highlights

INDICATED

10.26M AgEq

Contained within 0.96 Mt

333 g/t AgEq

INFERRED

32.91M AgEq

Contained within 2.43 Mt

421 g/t AgEq

INFERRED: TALININGS

2.74M AgEq

Contained within 2.43 Mt

421 g/t AgEq

  • Mineralized zones open to expansion
  • Excellene metallurgical recoveries 90% Silver & 97% Gold
  • Significant Resource upside with assays pending
  • Over 90% of the resource is located on Private Land

Indicated and Inferred Mineral Resources for the Hughes Project are presented using a 190 g/t AgEq cutoff grade for in situ resources, and a 45 g/t AgEq cutoff grade for resources in tailings. For Hughes Project Indicated and Inferred Mineral Resources, AgEq is based on silver and gold prices of $25/oz and $2100/oz respectively, and metallurgical recoveries of 90% and 97% for silver and gold, respectively. AgEq Factor= (Ag Price / Au Price) x (Ag Rec / Au Rec); g AgEq/t = g Ag/t + (g Au/t / AgEq Factor).

Qualified Person under NI 43-101

Galen McNamara, P.Geo., the President & CIO of the Company, and a qualified person pursuant to NI 43-101, has reviewed and approved the scientific and technical information contained on this website. Mr. McNamara has verified the data disclosed herein, including sampling and drilling data underlying the technical information contained herein, by reviewing blanks, duplicates and certified reference material that the Company inserted into the sample stream and confirming that they fall within limits as determined by acceptable industry practice.

Technical Report

Hughes Silver-Gold Property Technical Report

Effective Date: October 22, 2024

Red Mountain Project

Alaska, USA

About Red Mountain

Red Mountain is a district-scale polymetallic opportunity with significant upside potential in Alaska’s Bonnifield Mining District, approximately 100 km south of Fairbanks. The combination of high-grade mineralization, favorable jurisdiction and, importantly, State managed lands make the Red Mountain Project ideal for development.

With an established mineral resource and a broad pipeline of exploration targets, the project offers significant potential for resource expansion and new discoveries within Bunker Hill’s U.S. portfolio.

Project Highlights

INFERRED

168.6 Moz AgEq*

Contained within 15.6 Mt

Average grade: 336 g/t AgEq*

2026 summer drilling completed; 4,136 metres across 14 holes and five targets to test resource expansion and new discovery potential

  • Location: Situated in Alaska, the leading silver-producing state in the U.S.
  • Mineralization: Silver occurs alongside zinc, lead, copper and gold in the project's polymetallic deposits
  • Exploration Scale: More than 35 known mineralized prospects extend across a 60 km trend, with resources defined at Dry Creek and West Tundra Flats
  • Growth Potential: Exploration targets resources expansion at Dry Creek and new discoveries beyond the existing deposits

Qualified Person under NI 43-101

Galen McNamara, P.Geo., the President & CIO of the Company, and a qualified person pursuant to NI 43-101, has reviewed and approved the scientific and technical information contained on this website. Mr. McNamara has verified the data disclosed herein, including sampling and drilling data underlying the technical information contained herein, by reviewing blanks, duplicates and certified reference material that the Company inserted into the sample stream and confirming that they fall within limits as determined by acceptable industry practice.

Technical Report

Red Mountain VMS Property Technical Report

Effective Date: January 12, 2024

Bunker Hill Project

Idaho, USA

About Bunker Hill

The Bunker Hill Mine stands as a legendary fixture in American mining history, renowned for its exceptional base metal and silver production. Discovered in 1885, this iconic mine operated for over a century until its closure in 1991. During its remarkable 95-year run, Bunker Hill yielded an impressive 42.77 million tons of ore, boasting average grades of 8.43% lead, 4.52% zinc, and 3.52 ounces of silver per ton.

Historical Significance

The Bunker Hill Mine's impact on the Coeur d'Alene Mining District is profound:

A Leading Lead Producer

It accounted for nearly 42% of the district's

A Major Zinc Contributor

Contributed 41% of the total zinc output

A Strong Silver Legacy

Produced 15% of the district's total silver yield

Production Highlights

Throughout its operational history, Bunker Hill showcased remarkable productivity:

Over 40 distinct

mineralized zones were exploited

35 million tons

of ore concentrate
were produced

A staggering 165 million

ounces of silver were extracted

Location

The historic Bunker Hill Mine is located in the world-class Coeur d'Alene Mining District, the Silver Valley, renowned for its rich silver deposits. This strategic location was crucial to the mine's long-standing success and significant contributions to American mineral production.

Historical Context

The Bunker Hill Mine ceased operations in 1981 due to a combination of depressed base metal prices and the need for substantial capital investment to upgrade its facilities to comply with new environmental regulations. Since its closure, the mine has been under care and maintenance. As part of a U.S. Government-led regional environmental remediation effort, the mine's lead smelter and zinc processing plant were completely dismantled, and a government-operated Water Treatment Facility now manages its water discharge.

Revitalization Efforts

In 2020, a new leadership team took the helm, focusing on sustainable development and exploration of Bunker Hill's untapped zinc, silver, and lead resources. This team recognized a unique opportunity to leverage historical geological and production data using modern exploration software, creating new 3D models to identify potential extensions of known mineralized bodies.

Path to Production & Growth

Bunker Hill achieved first production at its Idaho mine in June 2026, marking the start of its ramp-up toward commercial production. The next phase focuses on increasing output and advancing plans for a larger-scale operation through the Bunker Hill 2.0 expansion.

Advancing to Commercial Production

Following first production in June 2026, Bunker Hill is focused on ramping up operations toward commercial production.

Targeting 2027 Production

The mine is targeting production of 2.5 million silver-equivalent ounces in 2027 as operations progress beyond the initial startup phase.

Bunker Hill 2.0 Expansion

The planned Bunker Hill 2.0 expansion targets processing capacity of 2,500 tonnes per day, providing a path to increased production.

Longer-Term Production Potential

The proposed expansion has the potential to increase annual production toward 5 million silver-equivalent ounces, building on the mine’s initial production targets.

Leadership

Richard Williams
Executive Chairman
Mr. Williams is a distinguished global mining executive and board leader, recognized for transformative value creation and governance across some of the world's most demanding markets. As Chief Operating Officer of Barrick Gold Corporation (2015-2018), he spearheaded operational and strategic initiatives that delivered an 80% increase in operating profit and orchestrated a complete reset of Barrick's relationship with the Tanzanian Government, resolving a legacy dispute and restoring a critical partnership.

He brings extensive board and C-suite experience as CEO of an Africa- and Central Asia-focused exploration company and former non-executive director of both Trevali Mining Corporation and Gem Diamonds PLC. Earlier, Mr. Williams commanded the British Special Forces Regiment (SAS), contributing elite operational insight and global leadership to his commercial roles.

A strong advocate of principled governance and stakeholder value, Mr. Williams blends frontline operational expertise and a proven ability to navigate complex stakeholder environments, positioning organizations for growth, resilience, and sustainable performance on the world stage.

He holds a Bachelor of Science in Economics from University College London, a Master of Arts in Security Studies from King's College London, and an MBA from Cranfield University.

Sam Ash
Ceo & Director
A former Executive General Manager of Barrick Gold’s Lumwana Copper Mine in Zambia, Mr Ash is an experienced American Mining Engineer and modernizing leader, with a proven track record of building and leading teams capable of optimizing and enhancing the operating efficiency, profitability and sustainability of mining operations in complex and challenging environments.

During his tenure at Lumwana Mr. Ash Delivered over $100M in sustainable free cash flow improvements, achieved 50% improvement in safety performance, executed a training and development program achieving 96% local workforce, and progressed expansion plans that doubled the value of mine.

BEng Mining Engineering from University of Missouri Rolla; MA in Strategic Leadership, London Business School.

Appointed May 2020

Bradley Barnett
Interim Chief Financial Officer
Bradley Barnett brings more than 30 years of international business experience, including over 15 years in the global mining sector with leadership roles spanning finance, operations, sustainability, and project development across Africa, Asia, South America, and North America.

Mr. Barnett previously served as Vice President of Sustainability at Bunker Hill Mining, where he helped establish the company’s landmark relationship with the United States Environmental Protection Agency, contributing to the restructuring of historical environmental liability terms and helping unlock investment that supported the reopening of the historic Bunker Hill Mine.

Over his career, he has held senior leadership roles, including CEO, CFO, and Managing Director, and previously served as a Managing Director at Barrick Gold. He has also served as CFO of Afghan Gold & Minerals Corp. and Central Asian Resources, and most recently founded Critical Minerals International, a battery materials venture focused on developing critical mineral supply chains.

Mr. Barnett holds a bachelor’s degree in economics from the University of California, Riverside and resides in San Francisco, California, with his family.

Brenda Dayton
Vice President, Investor Relations
Brenda is an experienced investor relations and corporate communications executive with over 20 years of mining industry experience. As Vice President of Investor Relations, she is responsible for Bunker Hill’s internal and external communications functions, investor relations activities, stakeholder engagement, and media relations. With over 30 years of experience in the financial industry, Brenda provides a wealth of knowledge, insight, and connections to the role, along with a passion for the mining sector and its potential for growth and innovation.

Prior to joining the Company, Brenda served in various executive and senior roles with precious metals companies, including Ivanhoe Mines, Sunward Resources, Golden Queen Mining, GR Silver Mining, and most recently, Japan Gold. Brenda holds a Bachelor of Arts degree from the University of Calgary.

Appointed April 2024

Tom Francis
General Manager
Tom Francis is the General Manager of the Bunker Hill Mine. Mr. Francis joins the Bunker Hill team after 10 years with Rio Tinto, the second-largest mining company in the world, where he was most recently Mine Manager at the Kennecott Bingham Canyon Mine (“Kennecott”) in Utah, USA, its single largest mining operation. Among other achievements, his team delivered world-class payload metrics on Kennecott’s ultra-class truck fleet while simultaneously increasing average haul truck speeds and tire life. Previous roles with Rio Tinto included responsibility for productivity across the full Kennecott value stream (mine, concentrator, smelter and refinery), three years in the Group strategic investment analysis team assessing its global suite of projects (greenfield, brownfield & closure), and several years in Rio Tinto Exploration (RTX) managing operational support (incl. safety) for Rio Tinto’s Exploration’s projects across Africa and Eurasia.

Prior to his mining experience, Mr. Francis served as an officer in the Royal Marines and UK Special Forces, serving on multiple operational tours in Kosovo, Iraq & Afghanistan. He is a dual national US/UK citizen having lived, studied and worked in both the US and the UK. He holds a first-class degree from the University of Oxford (BA, Mathematics & Computation).

Appointed January 2022

Mark McBride
Vice President, Finance
Mark McBride is Vice President, Finance at Bunker Hill Mining Corp., where he oversees financial reporting, accounting operations, internal controls, and financial planning for the Company. He has over a decade of experience in financial reporting, audit, and accounting within the mining industry.

Prior to joining Bunker Hill, he served as Corporate Controller at Great Panther Mining Limited and previously as Manager of Financial Reporting at Pretium Resources, where he was responsible for external financial reporting, internal financial analysis, budgeting, and audit coordination in accordance with IFRS and SEC requirements.

He began his career with PricewaterhouseCoopers in Vancouver and London, working on audit engagements for global mining companies including Rio Tinto, Anglo American, and Teck Resources.

He is a Chartered Professional Accountant and holds a Bachelor of Commerce in Accounting from the Desautels Faculty of Management at McGill University.

Verified data last updated:

Recent filings

Investor FAQ

Answers last refreshed: