Aya Gold & Silver is a Canadian precious metals mining company anchored in Morocco and active across the full mining value chain. The company focuses on a systematic, technology-led, data-driven approach to exploration along the Anti-Atlas Fault, which is one of Africa’s most prospective and underexplored mining regions. Aya operates the Zgounder silver-only mine and has a growth pipeline that includes the Boumadine polymetallic project, which is currently undergoing feasibility work. The company is committed to responsible mining and delivering sustainable value for shareholders, employees, and host communities.

Verified company data

Cash position
$171,670
Shares outstanding
56932471
Fully diluted shares
148,594,338
Mineral resource

Mineral Reserve estimate for Zgounder, as of September 30th, 2025

Cutoff Ag (g/t)ClassificationTonnes (kt)Ag (g/t)Contained Metal (koz)
Stockpile
N/AProven160134690
In-Pit Reserves
40Proven11,75013751,800
40Probable1,2201335,200
UG Reserves
90Proven1802071,200
90Probable2,39018914,500
Total
40/90Proven12,09013853,690
40/90Probable3,61017019,700
Total P&P
40/90Probable15,70014573,390
  1. Mineral Reserves have been estimated by Aya Gold & Silver Technical Service team, under the supervision of Patrick Pérez, P.Eng, full-time employee of Aya Gold & Silver and Qualified Person as defined by National Instrument 43-101. The estimate conforms to the CIM Definition Standards for Mineral Resources and Mineral Reserves.
  2. Mineral Reserves have been estimated using metal price assumption of $26/oz for silver.
  3. Open-pit Mineral Reserves are reported at a cut-off grade of 40 g/t Ag, and underground Mineral Reserves are reported at a cut-off grade of 90 g/t Ag.
  4. Cut-off calculations assume a processing and general & administration cost of $25.25/t, a metallurgical recovery of 90%, throughput of 1.4Mt per year, open-pit ore mining cost of $4.19/t, underground mining cost of $40/t, and an exchange rate of 9.5 MAD:US.
  5. Numbers may not add-up due to rounding

Mineral Resource Estimate for Zgounder as of June 30, 2025¹

Cutoff Ag (g/t)ClassificationTonnes (kt)Ag (g/t)Contained Metal (koz)
Pit-Constrained
40Measured13,82014464,140
40Indicated2,1501319,070
40Inferred56190350
Out-of-Pit
90Measured3242802,912
90Indicated2,64028424,100
90Inferred3603604,200
Total
40/90Measured14,15014767,050
40/90Indicated4,79028333,200
40/90Inferred4102164,500
  1. Mineral Resource Estimate for Zgounder as at June 30, 2025.
  2. The Mineral Resource is reported in compliance with NI 43-101 and classified in accordance with CIM guidelines.
  3. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. There is no certainty that Mineral Resources will be converted to Mineral Reserves.
  4. Mineral Resources are reported inclusive of Mineral Reserves.
  5. A silver price of $28/oz with a process recovery of 90%, and a rock processing cost of $25/t inclusive of G&A were assumed.
  6. The constraining pit optimization parameters were 50º pit slopes with a 40 g/t Ag cut-off.
  7. The out-of-pit Mineral Resource grade blocks were quantified above a 90 g/t Ag cut-off, below the constraining pit shell and within the constraining mineralized wireframes. Out–of-pit Mineral Resources exhibit continuity and reasonable potential for extraction by the cut-and-fill underground mining method.
  8. Mining costs are estimated at $2.00/t of waste and $6.80/t of ore, with a mining dilution factor of 5%.
  9. The Mineral Resource is reported at an in-pit cut-off of 40 g/t Ag and an out of pit cut-off of 90 g/t Ag.
  10. A 3% royalty applies.
  11. Mineral Resources have been rounded to reflect their confidence.
  12. Totals may vary due to rounding.
Projects

Zgounder Silver Mine Morocco

------
Ownership100%
CommoditySilver
StatusOperating
Mine TypeOpen-pit and underground
Land Package16 km2 (Mining) / 383 km2 (Exploration)

Zgounder is a rare silver-only mine producing high-quality silver doré at scale. Following a major expansion, it generates cash flow that fuels our development projects. The mine’s life has been extended to 2036, with potential for further growth.

Highlights

  • Production Start Date: Jan 2019 (Launch of flotation plant) Dec 2024 (Launch of expanded commercial plant)
  • Expected Mine Life: 11 Yrs (as of December 2025)
  • Processing Capacity: 1.4 Mt per year (LOM)
  • Recovery Rate: 88% (FY-25)
  • Mining/Processing Method: Open-pit and underground (cut-and-fill method & long-hole stoping method) / Cyanide leaching
  • Production: 4.8 Moz Ag (FY-25)
  • Product: Silver Doré bars

Mineral Reserves

  • Proven and Probable: 73 Moz Ag @145 g/t

Mineral Resources

  • Measured and Indicated: 100 Moz Ag @ 165 g/t
  • Inferred: 5 Moz Ag @ 340 g/t

Overview
Located in Morocco’s central Anti-Atlas Mountains, the wholly owned Zgounder Mine is a rare, silver-only operation that differentiates Aya Gold and Silver from producers recovering silver mainly as a by-product. The mine has a solid reserve base of 73 Moz of silver in the proven and probable categories.

The newly expanded operation, which ramped up in 2025, marked a major milestone in Zgounder’s transition to a high-capacity mine. The mine plan extends the operation’s life to 2036, supporting an average annual production of 6 Moz of silver over the Life of Mine (LOM). Zgounder is mined through a combination of open-pit and underground methods, with the open pit utilizing conventional drill-and-blast, and the underground employing both cut-and-fill and longhole stoping. Commercial production from the expanded plant was declared on December 29, 2024, with silver produced through cyanide leaching and refined into silver-doré bars. All revenues are derived from the sale of silver refined abroad.

An updated NI 43-101 technical report (with an effective date of September 30, 2025) was filed on December 15, 2025. For additional details, refer to the Reserve and Resource page of our website.

Location & Access
Zgounder is in the province of Taroudant, Kingdom of Morocco, in the central part of the Anti-Atlas Mountain. It is situated, by road, approximately 215 km south of the city of Marrakech, 220 km east of the city of Agadir and 140 km west of the city of Ouarzazate. The site is accessible via well-maintained paved highways (N10 and P1706) from Agadir to Taliouine (205 km), followed by a paved road to the nearby village of Askaoun. From Askaoun the Mine is easily accessible via a well-maintained gravel road.

Mining & Processing
Zgounder consists of a high-grade underground mining operation and open-pit mining operation that uses conventional mining methods, which feeds a processing plant designed to operate at 3,650 tonne per day (“tpd”) through 2026 and then at 3,850 tpd through the remainder of the life of mine, with ongoing evaluation to expand further. Ore is extracted from both underground stopes and near-surface zones, then crushed, ground, and treated through cyanide leaching to recover silver. The resulting silver produced is poured on site into silver doré bars for shipment to international markets.

Geology and Mineralization
Regional Setting: Zgounder lies within the Proterozoic Siroua Inlier (boutonnière) of the central Anti-Atlas, forming a transition between the northern Pan-African belt and the southern Eburnean domain of the West African Craton.

Local Geology: Within the Siroua Inlier, Zgounder is hosted in mid-Neoproterozoic (Cryogenian) Sarhro Group volcano-sedimentary rocks that were deformed during the Pan-African orogeny and later intruded by Bou Salda Formation volcanics and late-Neoproterozoic (Ediacaran) plutonism of the Assarag intrusive suite. Post-orogenic collapse led to the unconformable deposition of Ediacaran Ouarzazate Group volcanic rocks and younger Miocene volcanics, and the development of a network of N-, E-, and NE-trending conjugate faults and fractures.

Property Geology and Structural Setting: The Zgounder deposit is hosted within the Imghi Formation of the Sarhro Group, comprising fine-grained sandstones, siltstones, and turbiditic units deposited in a deep-marine, arc-related basin. Strata is weakly metamorphosed, with local hornfels and silicic, sericitic, and chloritic alteration adjacent to intrusive bodies. Mineralization is spatially associated with the contact between the Imghi sediments and the Tadmant Rhyolite of the Bou Salda Formation, together with related dolerite intrusions and granitic bodies of the Assarag intrusive suite.

Mineralization: Zgounder has been described as an epithermal Ag–Hg system, associated with felsic magmatism and hydrothermal activity, with ongoing work to refine its genetic model. The silver mineralization in the metasediments is predominately fracture filling along pre-existing joint/fractures/sites of dilation, or disseminated along bedding and joint planes, but can also be associated with hydrothermal breccias and quartz veins. Locally, silver occurs as fracture-filling hosted by the younger intrusive units—both within the rhyolite at the metasediment contact and within centimeter-thick granite offshoots that intrude the metasediments.

Exploration
Exploration remains central to Aya Gold and Silver's growth strategy. Between 2021 and 2025, Zgounder executed a broad, multi-year exploration program—starting with geophysical surveys that identified structures linked to silver mineralization, followed by regional geological mapping, hyperspectral imagery acquisition, and televiewer structural imaging. Together these efforts have built a robust geological model and continue to support resource growth.

Between 2022 and 2025, Zgounder advanced an extensive drilling campaign—comprising over 45,000 meters of reverse circulation drilling for definition and more than 150,000 m of diamond drilling for resource expansion, definition, regional exploration, and geotechnical programs. This successfully extended high-grade mineralization along the rhyolite and granite-contact zone, improved short-term mine planning through dense definition drilling, and tested new targets near-surface and at depth across the north, south, east, and west of the deposit to support long-term growth.

**Together, these programs reflect a consistent, multi-year commitment to expanding and strengthening the geological understanding of the Zgounder property.

Technical Reports and Key Presentations

Technical Report and Updated Mineral Resource Estimate - December 2025

Boumadine Morocco

Ownership85% Aya and 15% ONYHM
CommodityGold, silver, zinc, lead
StatusFeasibility Study work underway
Land package339 km2 (Permits & licenses)<br> 600 km2 (Exploration authorization)

The Boumadine project is a cornerstone of Aya’s long-term growth strategy and our most advanced development-stage asset. Recognized as one of the most attractive undeveloped precious-metal projects globally, Boumadine’s 2025 PEA outlined compelling economic potential. The project is undertaking feasibility study work as we continue to drill and unlock the district-scale opportunity.

Highlights

  • BASIS FOR PEA: 1 Mining license covering 32 km2 of Land
  • EXPECTED MINE LIFE: 14 Yrs
  • PROCESSING: Conventional flotation plant (2.9 Mt/yr)
  • MINE TYPE: Open-pit and underground
  • PRODUCTS: Three marketable concentrates (Pb, Zn, Pyrite)
  • TIMELINE: Feasibility study completion: YE 2027

PEA Results

  • AVERAGE ANNUAL PRODUCTION: 348 koz AuEq (Years 1-5) 271 koz AuEq (LOM)
  • INITIAL CAPITAL INVESTMENT: $463M Capital Intensity ratio of 7.6x
  • REVENUE DRIVERS: 57% Au, 30% Ag, 10% Zn, 3% Pb
  • OPERATING COSTS: AISC: $1,105 /oz Au Eq (Y1-Y5) AISC: $1,300 /oz Au Eq (LOM)
  • ECONOMIC ANALYSIS (base case, after-tax): NPV $3.5B / IRR 93%
  • ECONOMIC ANALYSIS (base case): Revenue (LOM): $11.0B EBITDA (LOM): $6.1B FCF (LOM): $4.7B after tax

Mineral Resources

  • INDICATED RESOURCE ESTIMATE: 1,110 koz AuEq @ 4.02 g/t
  • INFERRED RESOURCE ESTIMATE: 4,260 koz AuEq @ 2.92 g/t

Overview
The Boumadine polymetallic project is Aya’s key development-stage asset and a cornerstone of our long-term growth strategy in Morocco. Boumadine is regarded as one of the most attractive undeveloped precious-metal projects globally, offering district-scale potential with mineralization open in all directions.

Aya announced the results of an updated preliminary economic assessment in 2026, with key economics shown in the table above and project highlights summarized below:

  • Production of three marketable concentrates: zinc, lead, and pyrite
  • Revenue largely driven by precious metals, with gold at 57% and silver at 30%
  • Favorable market conditions for pyrite concentrate due to its precious metal content and high sulfur grade
  • Low capital intensity and competitive operating costs
  • Attractive processing scale of 2.9 Mt/year
  • Flexible open-pit and underground mining design
  • LOM average head grade of 3.10 g/t AuEq

Boumadine benefits from existing regional infrastructure, which will be enhanced to support full-scale operations. Water sources have been identified with a supply plan in place, while power will be delivered via a dedicated 72 km power line connecting to the national grid. Key transport routes to Nador-West port and multiple national highways provide efficient logistics options in addition to rail. The site’s favorable topography supports the planned tailings storage facility, and on-site development will include a new processing plant, workshops, warehouses and administrative buildings.

Boumadine’s district-scale potential positions it as a key development asset for Aya. Feasibility study work is ongoing and focuses on drilling, engineering, and optimization to advance the project toward potential development.

Location & Access
The Boumadine Property is located in the Province of Errachidia, Kingdom of Morocco, approximately 220 km east of the City of Ouarzazate and 70 km southwest of the City of Errachidia. The nearest town and village, Tinejdad and Bouyoud, lie 16 km and 4 km from the site, accessible via paved and gravel roads suitable for all-terrain vehicles.

Mining & Processing
Mining Operations
The PEA outlines a combined open-pit and underground mining operation sustaining an 8,000 tpd processing rate. Multiple open pits in the North, Central, and South zones would be mined in year one, with underground mining starting in year 3 and continuing through Year 14.

Key features:

  • Six open pits along a 6km trend, mainly above 350m depth.
  • Contract mining with 50 Mt/year capacity, including ~20 Mt of pre-stripping during construction..
  • Three underground mines (North, Central, South) with dedicated declines and mined using longitudinal modified Avoca long-hole stoping.
  • Development handled by contractors; Aya mines mineralized zones.
  • Average 348 koz AuEq/year over the first five years, mainly from open pits.
  • Ongoing drilling is expected to grow resources and extend mine life.

Processing
The PEA includes a conventional 8,000 tpd (2.9 Mt/year) flotation plant, prioritizing high-grade feed in the first five years at 4.11 g/t AuEq.

Highlights:

  • Crushing, SAG-and-ball milling circuit producing a P80 of 58 µm.
  • Three flotation circuits producing separate zinc, lead, and pyrite concentrates containing payable gold and silver.
  • Lead and zinc concentrates go through rougher flotation, regrinding, and cleaning; pyrite uses a rougher circuit.
  • Concentrates are thickened and filtered (lead shipped in bags; zinc and pyrite in bulk).
  • Tailings are thickened and stored in a dedicated tails storage facility (TSF).

Geology and Mineralization
Boumadine is a large, polymetallic deposit (Au–Ag–Pb–Cu–Zn) hosted within the Proterozoic Ougnat window of the Anti-Atlas. Mineralization occurs within a well-defined volcanic sequence and extends over at least 5.4 km of strike, offering strong potential for further growth.

Geological Setting
The geology of the Massif consists of a Neoproterozoic metasedimentary basement overlain unconformably by a Late Neoproterozoic volcano-sedimentary rock sequence and by Paleozoic lacustrine sedimentary and minor volcanic rocks. The basal sequence is made of felsic tuffs, vitroclastic tuffs, and intercalations of andesite flows forming the Tamerzaga-Timrachine Formation (TTF). The TFF is invaded by swarms of gabbroic to andesitic dykes, principally oriented-N340deg, followed by injections of rhyolitic intrusions and dykes. The Boumadine deposits is contained within the TFF which is covered by shallow lacustrine sedimentary and minor volcanic rocks (Isif-Ouinou-Oufrouh formation; IOF).

Mineralization Characteristics
The mineralization consists generally of 1m to 4m wide (locally reaching over 10m width) N340-oriented massive sulfide lenses/veins sharply dipping eastward (> 70°).

The massive sulphide veins (>80%) are composed mainly of pyrite, with variable proportions of sphalerite, galena, arsenopyrite and chalcopyrite. Within the massive sulphide veins, zones of breccias are present with silicified angular fragments and round fragments completely replaced by pyrite. These zones underline the presence of syn-volcanic faults used by mineralization.

Replacement of fragments by pyrite in weathered felsic tuffs locally induces large zones several tens of meters thick of sub-economical anomalous values.

Host Rocks & Alteration
The mineralization is mainly in a sequence of volcaniclastic rock composed of felsic tuff that rests in unconformity on mafic tuffs. Those tuffs are interpreted as having a volcaniclastic origin, sedimentation in an underwater basin.

Intrusive rocks are divided into two groups: pre- to syn-mineralization and post-mineralization. Pre- to syn-mineralization dykes are mainly felsic to intermediate in composition and are found as dykes or sills in both mafic and felsic tuffs, suggesting bimodal volcanism. Late intrusions are mainly rhyolitic subvolcanic domes that cut mineralization and are spatially associated with normal faults. They are interpreted as being synchronous with the post-mineralization deformation episode that segmented the mineralized zones. A swarm of regional extended mafic dykes cut each lithology on the property.

Two sequences of hydrothermal alteration are observed on the property. The first sequence mainly affects felsic tuff and manifests as phyllic alteration (Quartz-sericite-pyrite). Proximal to the veins, there is an advanced clay alteration composed of kaolinite, pyrophyllite and trace of vuggy silica. The second sequence of alteration mainly affects the underlying mafic tuffs and consists of large-scale propylitization (epidote and chlorite). Near the veins, the alteration is composed of black chlorite, pyrophyllite and pyrite. The transition between these two alterations is relatively rapid and consistent with the change in composition of the tuffs and suggests chloride fluids rich in Fe, Zn and Pb, typical of VMS style mineralization.

Exploration
Exploration activities completed by Aya on the Boumadine Property since 2022, other than drilling, include surface trenching, satellite-based hyperspectral surveys, aerial electromagnetic and magnetic survey, mineral prospecting, geological mapping, grab sampling and assaying.

Between May 2022 and December 2025, Aya completed 1078 drill holes totaling 353 055 meters. The drilling programs aimed to extend the mineralization of the North, Central, and South Zones while also testing targets located further from the main mineralized trend.

Boumadine historical pyrite stockpile operation
In Q4 2025, Aya Gold & Silver launched the reclaiming operation of the historical pyrite stockpile at Boumadine. The legacy flotation by-product from past operations contains meaningful grades of both silver and gold, creating an opportunity to unlock near-term value under favourable market conditions. The program is expected to support near-term cash flow while advancing Aya’s broader development strategy. The initiative underscores the commercial potential and marketability of Boumadine’s gold- and silver-rich pyrite concentrate that Boumadine may eventually produce during operation. The project also aligns with Aya’s commitment to minimizing environmental impact.

Key highlights:

  • Historical material: ~260 kt of ore from past lead and zinc operations
  • Estimated production rate: ~10 kt per month
  • Program duration: 20–24 months
  • Expected output: ~2.5 million silver-equivalent ounces
  • Anticipated grades: ~2.30 g/t gold and 144 g/t silver
  1. AgEq ounces are at an 80:1 Au:Ag ratio

  2. For more details, see Aya’s November 19, 2025 press release on the Boumadine legacy stockpile.

This initiative is expected to be a limited duration of 20 to 24 months. The overall Boumadine polymetallic project remains at the exploration and evaluation stage and is not in commercial product.

Technical Reports and Key Presentations

Technical Report and Updated Mineral Resource Estimate of the Boumadine Polymetallic Project, Kingdom of Morocco, October 20, 2026
Leadership

Benoit La Salle (President, Chief Executive Officer and Director, Mining executive with over 30 years of experience in developing and operating projects across West Africa. He founded SEMAFO Inc. and has served on the boards of multiple publicly traded companies.), Ghislane Guedira (Chair & Director (Independent), Finance executive with extensive experience in the energy, mining, and advisory sectors. Currently CEO of A.P. Moller Capital Morocco.), Yves Grou (Director (Independent), Finance executive with over four decades of experience, co-founder of GLA, and member of the Québec Institute of Chartered Professional Accountants.), Annie Torkia Lagacé (Director (Independent), Over 20 years of legal and financial experience, currently Chief Legal Officer of IAMGOLD.), Eloïse Martin (Director (Independent), Finance executive with extensive experience in project finance and capital advisory, currently Head of Project Finance for Ivanhoe Mines Ltd.), John Burzynski (Director (Independent), Geologist with over 35 years of experience in mineral exploration and development, previously Chairman and CEO of Osisko Mining Inc.), Krystal Ramsden (Director (Independent), Mining engineer and investment professional with 20 years of experience, founding partner and Head of Research at Extract Capital.), Yves Bonin (Director (Independent), Audit and finance executive with over 30 years of experience, currently Executive Vice-President and CFO of COFOMO.), Mustapha El Ouafi (President-Managing Director, Morocco, Mining executive with extensive leadership experience in Morocco and the MENA region.), Ugo Landry-Tolszczuk (Chief Financial Officer, Finance executive with 15 years of experience in mining, energy, and technology sectors.), Elias J. Elias (Chief Legal & Sustainability Officer, and Corporate Secretary, Extensive experience advising mining and energy companies in West Africa.), Alex Ball (Executive Vice-President, Capital Markets, Corporate finance and capital markets executive with over 15 years of experience in mining.), Raphaël Beaudoin (Executive Vice-President, Operations, Oversees operations at the Zgounder Silver Mine with over 15 years of experience in mineral processing and operations.), David Lalonde (Executive Vice-President, Exploration, Geologist with over 24 years of experience in mineral exploration and project development.), Meryem Baroudi (Director, Human Resources & General Affairs, Human resources executive with extensive experience in the mining industry.)

Verified data last updated:

Recent filings

Investor FAQ

Answers last refreshed: