About
Gold X2 is a growth-oriented gold company focused on delivering long-term shareholder and stakeholder value through the acquisition and advancement of primary gold assets in tier-one jurisdictions. It is led by the ex-global head of structural geology for the world’s largest gold company and backed by one of Canada’s pre-eminent private equity firms. The Company’s current focus is the advanced stage 100% owned Moss Gold Project which is positioned in Ontario, Canada, with direct access from the Trans-Canada Highway, hydroelectric power near site, supportive local communities and skilled workforce.
Verified company data
- Cash position
- $40,000,000
- Shares outstanding
- 101,110,094
- Fully diluted shares
- 670,884,034
- Mineral resource
The 2026 updated National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101") mineral resource estimate ("MRE") for the Moss and East Coldstream Deposits has expanded to 2.458 million ounces of Indicated gold resources at 1.04 g/t Au, contained within 73.8 million tonnes and 4.209 million ounces of Inferred gold resources at 0.97 g/t Au contained within 134.7 million tonnes. The Moss Deposit also has a silver MRE of 3.160 million ounces of indicated silver resources at 1.53 g/t Ag contained within 64.3 Mt and 6.273 million ounces of inferred silver resources at 1.55 g/t Ag contained within 125.9 Mt. Results of a preliminary economic assessment ("PEA") of the Moss Gold Project suggest the potential for the deposit to support a long-life mining operation with a strong production profile and low production costs. The MRE and PEA are supported by a NI 43-101 technical report for the Moss Gold Project available on the Company’s website and under the Company’s issuer profile on SEDAR+.
- Projects
Moss Gold Project
Overview
Potential to be a Top 10 Producing Mine in Canada
Robust Economics with Strong PEA
PEA a Base Case with attractive economics, significant leverage gold prices, optimization upside and extensive growth optionality
High-Quality Mineral Resource Estimate Moss Deposit
Major Infrastructure to Support a Mining District
Nearby Trans-Canada Highway, low-cost power, rail connectivity and deep-water port access at Thunder Bay
Untapped Exploration Upside & Active Drilling
Active multi-purpose drill program targeting grade control, resource expansion and regional discoveries along a 35 km mineralized trend
Management Team with Proven Track Record
Experienced leadership and board with a history of district-scale discoveries, mine development and value creation across multiple jurisdictions
- Au and Ag Indicated resource contained within 64.3 million tonnes; Au and Ag Inferred resource contained within 125.9Mt. The current Mineral Resource Estimate and PEA include only open-pit mineralization. All underground mineralization has been excluded from the resource model and mine plan. For more information on the Mineral Resource Estimate, see the Preliminary Economic Assessment NI 43-101 Technical Report; Effective January 26, 2026.
2025 G-MINING SERVICES
OPEN PIT MINERAL RESOURCE ESTIMATE*
Refined Geological Model focused on higher-Confidence resource
Highlights
73% increase in indicated gold ounces vs prior estimate
Material upgrade in resource confidence, more mineable resource base
Addition of reportable silver resource(Indicated + Inferred)
Improved continuity across mineable domains
- Au and Ag Indicated resource contained within 64.3 million tonnes; Au and Ag Inferred resource contained within 125.9Mt. The current Mineral Resource Estimate and PEA include only open-pit mineralization. All underground mineralization has been excluded from the resource model and mine plan. For more information on the Mineral Resource Estimate, see the Preliminary Economic Assessment NI 43-101 Technical Report; Effective January 26, 2026.
Moss gold project
Open Pit Resource Summary
- Au and Ag Indicated resource contained within 64.3 million tonnes; Au and Ag Inferred resource contained within 125.9Mt. The current Mineral Resource Estimate and PEA include only open-pit mineralization. All underground mineralization has been excluded from the resource model and mine plan. For more information on the Mineral Resource Estimate, see the Preliminary Economic Assessment NI 43-101 Technical Report; Effective January 26, 2026.
KEY CHANGES WITH NEW MRE
Underground ounces excluded from resource model
Inferred spacing tightened to 90m x 90m
Resource Constructed to account for 5x5x5m SMU
Addition of reportable Silver Resource(indicated and inferred)
Updated structural modelling and 2025 drilling
→ Improved grade continuity
Geostatistical improvements
→ more Indicated
Model aligned to open-pit PEA mine plan
PEA HIGHLIGHTS
Summary Of project Economics
Mineral resources that are not mineral reserves have no demonstrated economic viability. No mineral reserves have been calculated for the Project. There is no guarantee that any part of the mineral resources discussed herein will be converted to a mineral reserve in the future
- The PEA is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized.
Base Case: Gold US$2,750/oz, Silver US$35.00/oz
CAD/USD $1.34.Consensus Case: Gold US$3,300/oz, Silver US$40.00/oz CAD/USD $1.35 Source: CIBC Capital Markets.
Upside Case: Gold US$5,000/oz, Silver US$80.00/oz CAD/USD $1.35.
Cash operating costs consist of: mining costs, processing costs and site G&A.
AISC: consist of cash operating costs, royalties, corporate G&A, selling costs and silver credits and excluding pre-production capital costs. Refer to the disclosure under the “Non-GAAP Financial Measures” heading of page 3 of this Presentation for more information.
Base Case illustrates Large-scale gold production
Moss Gold Project has extensive infrastructure to support potential district scale mining camp
Highway 11 –Trans-Canada Highway
Access to road, rail, power, deep water port, water, skilled people & contractors
Power - $0.11 / kwh power at project site
Exceptional width and presence OF HIGH-GRADE SHEARS
- All assays capped at 30 g/t Au
See company news releases for more information, dating: Oct 21 2021, Apr 19 2022, Sep 29 2022, Nov 2 2022, Jan 17 2023, Feb 2 2023, Jan 17, 2025, Mar 3, 2025, Apr 22, 2025, May 15,2025, and Aug 12, 2025.
Technical Report
Preliminary Economic Assessment NI 43-101 Technical Report
Effective Date: January 26, 2026Qualified Person
Peter Flindell, P.Geo., MAusIMM, MAIG, Chief Operating Officer of the Company, a qualified person under NI 43-101 has approved the scientific and technical information contained in the website.
- Leadership
Michael Henrichsen (Chief Executive Officer and Director, Structural geologist with extensive experience, previously global structural geologist at Newmont, significantly increased reserves in Ghana.), Peter Flindell (Chief Operating Officer, Over 40 years of experience in mineral exploration and feasibility studies, led teams to discover and develop gold and copper mines globally.), Michael Kanevsky (Chief Financial Officer, Senior executive with over 15 years in the mining industry, expertise in regulatory compliance and financial reporting.), Sam Gibson (Vice President of Corporate Development, Over 10 years of expertise in resource-focused finance, specializing in institutional sales and investment banking.), Amiel Blajchman (Vice President of Sustainability, Held senior roles with major mining companies, led environmental assessments and ESG strategy.), Tom Obradovich (Chairman, Over 42 years of expertise in mining exploration and financing, co-founded Canadian Royalties Inc. and Aurelian Resources Inc.), David Stone (Director, 40+ years of engineering and financial consulting experience in mining projects worldwide.), Shawn Khunkhun (Director, Over 15 years in capital markets and mineral exploration, current CEO of Dolly Varden Silver Corp.), Joanna Pearson (Director, Over 25 years in financial reporting and risk management in mining, previously CFO of Endeavour Mining plc.), Kyle Hickey (Director, Managing Director of SAF Group, responsible for investment management in Metals and Mining.), Brad Cornborough (Director, Lawyer with extensive experience in capital projects and regulatory matters in mining, current General Counsel of Seaspan Marine.)
Verified data last updated:
Recent filings
- Report of exempt distribution excluding Schedule 1 of 45-106F1
- News release
- Gold X2 Files Third Quarter 2026 Financial Statements · Gold X2 Files Third Quarter 2026 Financial Statements (QuoteMedia 8158545287726484)
- 52-109F2 - Certification of interim filings - CEO (E)
- 52-109F2 - Certification of interim filings - CFO (E)
- MD&A
- Interim financial statements/report
- Gold X2 Completes Acquisition of Certain Claims from Bold Ventures Inc. · Gold X2 Completes Acquisition of Certain Claims from Bold Ventures Inc. (QuoteMedia 5042914195992796)
Investor FAQ
The most recent item in the document index is a 2026-11-17 filing (auxx_2026-11-17_00-18-41.pdf, classified as a press release) and a 2026-11-17 other document (auxx_2026-11-17_22-35-48.pdf), but the contents of these documents are not included in the verified data provided, so their subject matter cannot be summarized. Other recent items include the Third Quarter 2026 Financial Statements filed on 2026-11-13 and the completion of the acquisition of certain claims from Bold Ventures Inc. announced on 2026-11-11. Further detail on these items is available in the referenced documents.
Gold X2's principal asset is the advanced stage, 100% owned Moss Gold Project in Ontario, Canada, with direct access from the Trans-Canada Highway and hydroelectric power near site. The 2026 updated NI 43-101 mineral resource estimate for the Moss and East Coldstream Deposits reports 2.458 million ounces of Indicated gold resources at 1.04 g/t Au (73.8 million tonnes) and 4.209 million ounces of Inferred gold resources at 0.97 g/t Au (134.7 million tonnes), with the Moss Deposit also holding silver resources. A preliminary economic assessment effective January 26, 2026 indicates potential for a long-life, open-pit mining operation, though no mineral reserves have been calculated for the project.
Answers last refreshed: