About
Arizona Metals Corp. (TSX: AMC | OTCQX: AZMCF) is a publicly traded mineral exploration company focused on the discovery and development of high-grade copper-gold-zinc VMS deposits. The company owns two flagship projects, Kay Mine and Sugarloaf Peak, and is positioned to advance exploration in one of the most mining-friendly jurisdictions in North America. Key highlights include the high-grade VMS deposit at Kay Mine with expansion potential and the large-scale gold target at Sugarloaf Peak with heap-leach potential. Arizona Metals is committed to ethical leadership, environmental stewardship, and corporate transparency.
Verified company data
- Cash position
- $11.0 M
- Shares outstanding
- 136.7 M
- Fully diluted shares
- 141.95 M
- Mineral resource
The Kay Mine Project now boasts a significant milestone with the release of its maiden Mineral Resource Estimate (MRE) in June 2025, confirming its status as a high-grade polymetallic Volcanogenic Massive Sulphide (VMS) deposit. The resource outlines robust copper, gold, zinc, silver, and lead mineralization with excellent continuity and geometry suitable for bulk underground mining.
- Metal content was calculated using the following price assumptions: US$2,200/oz Au, US$26/oz Ag, US$4.10/lb Cu, US$1.00/lb Pb, US$1.35/lb Zn
- Metallurgical recoveries applied were: 92% Cu, 76% Pb, 85% Zn, 76% Au, 75% Ag
Indicated Tonnes (Mt) 9.28 Contained Metal Gold (Au) 1.39 g/t 415 koz Silver (Ag) 27.6 g/t 8,253 koz Copper (Cu) 0.97% 197.9 Mlbs Lead (Pb) 0.33% 67.3 Mlbs Zinc (Zn) 2.39% 490.1 Mlbs CuEq 3.18% 650.6 Mlbs Inferred Tonnes (Mt) 0.86 Contained Metal Gold (Au) 1.06 g/t 29 koz Silver (Ag) 15.4 g/t 423 koz Copper (Cu) 0.87% 16.4 Mlbs Lead (Pb) 0.20% 3.8 Mlbs Zinc (Zn) 1.68% 31.8 Mlbs CuEq 2.44% 46.1 Mlbs Infill Potential: The initial Mineral Resource Estimate (MRE) shows strong potential for growth through additional drilling between existing holes, which could significantly upgrade the Inferred category to Indicated.
Camp-Scale Potential: Current resources cover less than 5% of the Kay Project’s 10-kilometre strike length of prospective, folded host rocks—highlighting major untapped upside across the broader land package.
Expansion Potential: The deposit remains open for expansion along strike and at depth, offering considerable opportunity to grow the resource base beyond the boundaries of the current MRE.
* The Mineral Resource Estimate was prepared by Allan Armitage, Ph.D., P.Geo., of SGS Geological Services, an independent Qualified Person as defined by NI 43-101. Dr. Armitage conducted site visits to the Kay Mine property on October 25–26, 2023 and April 7–8, 2024. The estimate was peer reviewed by Ben Eggers, MAIG, P.Geo., also of SGS Geological Services and an independent Qualified Person under NI 43-101, who visited the property on May 30, 2025.
- Projects
Kay Mine Project
Uncovering a High-Grade Cu-Au-Zn VMS Deposit in Arizona
The Kay Mine Project is a high-grade Volcanogenic Massive Sulphide (VMS) deposit located in Yavapai County, Arizona. Defined from a depth of 60 meters to at least 900 meters, the deposit remains open at depth and along strike, presenting significant exploration upside. The project benefits from road, power, and water access across a combination of private and BLM mining claims, with no existing royalties.
Key Highlights:
Black circle with white arrow pointing right.
High-Grade Mineral Resource-9.2M tonnes @ 3.2% CuEq Indicated + 0.9M tonnes @ 2.4% CuEq Inferred, with potential for further expansion.
Black circle with a white arrow pointing right.
Large-Scale VMS System - Hosted in a Proterozoic-aged metamorphic belt, part of a region with over 70 known VMS deposits, several of which have seen significant historic production.
Black circle with a white right arrow.
Strong Exploration Potential - Drilling has extended mineralization well beyond historic workings, with new targets identified at depth and along strike with less than 10% of prospective mineralized horizon drill-tested to-date.
Black circle with a white arrow pointing right.
Exceptional Location & Infrastructure - Situated 74 km north of Phoenix with year-round access, strong local support, and an established mining workforce.
Historical Background
The Kay Mine has aproven mining legacydating back to thelate 19th century, with historic production and extensive exploration efforts:
Pre-1900:
Small-scale mining produced approximately 635 tonnes of high-grade ore.
1918-1929:
Extensive underground development included the No. 1 Shaft (457m deep), No. 4 Shaft (366m deep), and over 11 levels of workings, though no ore was produced.
1949-1956:
Operators including Black Canyon Copper Corporation and Republic Metals Company shipped 3,016 tonnes of ore, but operations ceased after a mine collapse.
1972-1974:
Exxon Minerals conducted geophysical surveys and 8,094 meters of drilling, significantly expanding the resource model.
2018-Present:
Arizona Metals has conducted 135,000 m of drilling, geochemistry, and geophysics, outlining a deposit to at least 900m below surface
Regional Production
The Kay Mine Project is strategically positioned within one of Arizona’s most prolific VMS districts, placing it in a well-established mining jurisdiction with a rich history of high-grade production. The presence of numerous past-producing Cu-Au-Zn mines in the region not only reinforces the high-grade nature of the deposit but also provides significant geological, economic, and logistical advantages that enhance the potential for project success.
Black circle with a white arrow pointing right.
Historic District: The region contains over 70 known VMS deposits, with historic production surpassing 50 million tonnes of ore at an average grade of 3.6% Cu, amounting to approximately 3.99 billion pounds of copper.
Black circle with a white arrow pointing right.
Nearby Mines: The Kay Mine Project is surrounded by multiple past-producing Cu-Au-Zn mines, which serve as important analogs for understanding geological continuity, ore body structures, and mineralization trends.
Black circle with a white right-pointing arrow.
Infrastructure & Mining-Friendly Jurisdiction: Arizona’s pro-mining regulations, skilled workforce, and established infrastructure (roads, power, and water) reduce development costs and accelerate project advancement, enhancing Kay Mine’s economic viability.
Drilling Pierce Points & Intercept Highlights
Mineral Resource Estimate (MRE)
The Kay Mine Project now boasts a significant milestone with the release of its maiden Mineral Resource Estimate (MRE) in June 2025, confirming its status as a high-grade polymetallic Volcanogenic Massive Sulphide (VMS) deposit. The resource outlines robust copper, gold, zinc, silver, and lead mineralization with excellent continuity and geometry suitable for bulk underground mining.
- Metal content was calculated using the following price assumptions: US$2,200/oz Au, US$26/oz Ag, US$4.10/lb Cu, US$1.00/lb Pb, US$1.35/lb Zn
- Metallurgical recoveries applied were: 92% Cu, 76% Pb, 85% Zn, 76% Au, 75% Ag
Indicated Tonnes (Mt) 9.28 Contained Metal Gold (Au) 1.39 g/t 415 koz Silver (Ag) 27.6 g/t 8,253 koz Copper (Cu) 0.97% 197.9 Mlbs Lead (Pb) 0.33% 67.3 Mlbs Zinc (Zn) 2.39% 490.1 Mlbs CuEq 3.18% 650.6 Mlbs Inferred Tonnes (Mt) 0.86 Contained Metal Gold (Au) 1.06 g/t 29 koz Silver (Ag) 15.4 g/t 423 koz Copper (Cu) 0.87% 16.4 Mlbs Lead (Pb) 0.20% 3.8 Mlbs Zinc (Zn) 1.68% 31.8 Mlbs CuEq 2.44% 46.1 Mlbs Infill Potential: The initial Mineral Resource Estimate (MRE) shows strong potential for growth through additional drilling between existing holes, which could significantly upgrade the Inferred category to Indicated.
Camp-Scale Potential: Current resources cover less than 5% of the Kay Project’s 10-kilometre strike length of prospective, folded host rocks—highlighting major untapped upside across the broader land package.
Expansion Potential: The deposit remains open for expansion along strike and at depth, offering considerable opportunity to grow the resource base beyond the boundaries of the current MRE.
* The Mineral Resource Estimate was prepared by Allan Armitage, Ph.D., P.Geo., of SGS Geological Services, an independent Qualified Person as defined by NI 43-101. Dr. Armitage conducted site visits to the Kay Mine property on October 25–26, 2023 and April 7–8, 2024. The estimate was peer reviewed by Ben Eggers, MAIG, P.Geo., also of SGS Geological Services and an independent Qualified Person under NI 43-101, who visited the property on May 30, 2025.
Sugarloaf Peak Project
Unlocking the Potential of a Large-Scale Gold System
The Sugarloaf Peak Project, located in La Paz County, Arizona, is a heap-leach, open-pit gold target with significant exploration upside. The project spans 4,400 acres of BLM claims and contains a historic resource estimate* of 1.5 million ounces of gold at a grade of 0.5 g/t Au, making it a highly prospective bulk tonnage gold system.
Key Highlights:
Black circle with white right arrow.
Large-Scale Gold Target-Historic resource estimate indicate 100 million tons of mineralized material with near-surface oxide gold.
Black circle with a white right arrow.
Excellent Metallurgical Characteristics - Preliminary testing has shown oxide gold recoveries of up to 95%.
Black circle with a white right-pointing arrow.
Strong Exploration Potential - Drilling has intersected sulphide gold mineralization at depths exceeding 500m, suggesting further expansion potential.
Black circle with a white arrow pointing right.
Strategic Location & Infrastructure - The deposit sits adjacent to Interstate 10, with access to water, electricity, and natural gas, making it highly accessible for future development.
Historical Background
The Sugarloaf Peak Project has a long history of exploration dating back to the 1960s, with multiple operators advancing the deposit through geological mapping, sampling, geophysics, and drilling campaigns.
1962-1983:
Early exploration focused on copper-molybdenum potential, with Westworld Oil & Gas (1981-1983) shifting focus to gold, drilling 10 holes and outlining a historic resource of 1.5 million ounces at 0.5 g/t Au.
1984-1995:
Operators including Amselco, Cominco, and Arimetco conducted additional drilling and resource modeling, confirming extensive gold mineralization in near-surface oxides.
2008-2012:
Riverside Resources & Choice Gold completed rock sampling, geophysics, and a multi-phase drill program, further refining the deposit.
2014-Present:
Arizona Metals acquired 100% ownership, conducting new drilling, metallurgical studies, and resource expansion work, confirming heap-leach recoveries of up to 95% and identifying deep sulphide exploration targets.
Geology
The Sugarloaf Peak Project is hosted within the Dome Rock Igneous Suite, a sequence of Jurassic metavolcanics and associated intrusive rocks that form part of the Mojave-Sonora Gold Belt. The deposit is characterized by a large-scale, disseminated gold system, with mineralization primarily associated with quartz-sericite-pyrite alteration and localized silica-pyrite breccias.
Black circle with a right-pointing white arrow.
Property Geology & Host Rocks
- The main host rocks are Jurassic-aged metavolcanics, predominantly andesitic to rhyolitic pyroclastic units, intruded by granitoid stocks and dikes.
- The dominant alteration includes sericite, argillic, and advanced argillic facies, forming a 2.5 km x 4 km alteration halo, indicative of a large-scale hydrothermal system.
- Gold mineralization is structurally controlled, occurring in sheeted veins, stockworks, and disseminated sulphides, with high-grade zones correlating to areas of intense quartz-sericite-pyrite alteration.
Black circle with white arrow pointing right.
Gold Mineralization & Alteration
- Quartz-Sericite-Pyrite (QSP) Alteration – The primary gold-bearing alteration zone extends over 5 km in length and 1.6 km in width, forming a tabular body with gold grades exceeding 650 ppb Au.
- Argillic & Advanced Argillic Alteration – This alteration surrounds the core mineralized zone and is associated with zunyite-alunite stockwork deposits, indicating oxidized, low-pH fluid evolution.
- Propylitic Alteration – A broader district-scale propylitic halo, dominated by chlorite-epidote, suggests a large hydrothermal footprint similar to other porphyry-related systems
Historic Resource
The Sugarloaf Peak Project hosts a historic gold resource estimate of 1.5 million ounces of gold at a grade of 0.5 g/t Au, based on drilling conducted to a shallow depth of just 70 meters. The estimate suggests significant expansion potential, both laterally and at depth.
The deposit consists predominantly of oxide gold mineralization, which has demonstrated high heap-leach recovery rates of up to 95% in metallurgical test work. Additionally, deeper drilling has revealed sulphide mineralization, with recoveries of up to 85%, suggesting potential for additional processing options.
- Leadership
Duncan Middlemiss (President and CEO, Experienced leader in the mining sector with a strong track record in project development and operational management.), Pamela L. Saxton (Director, Over 35 years of senior leadership and board experience in mining and natural resources, previously served as CFO for several mining companies.), Ankit Shah (Director, Extensive experience in finance, capital markets, and corporate strategy, with a strong track record in growth-oriented companies.), Jacques Perron (Director, Not discovered), Breanne Beh (Director, Not discovered)
Verified data last updated: