
About
Argenta Silver Corp. is a focused silver exploration company committed to advancing projects that support the global energy transition. Our mission is to create sustainable, long-term value for shareholders by acquiring and developing high-potential silver assets in mining-friendly jurisdictions. Led by an experienced management team with deep expertise in exploration, finance and project development, Argenta takes a disciplined, strategic approach to growth. With a strong emphasis on responsible mining practices, we are positioned to meet the rising demand for silver, a critical metal in renewable energy and emerging technologies, while building a lasting and successful company.
Verified company data
- Cash position
- ~C$23 Million in Working Capital
- Shares outstanding
- 290,337,502
- Fully diluted shares
- 340,810,327
- Mineral resource
Mineral Resource Estimate (2024)(1)
Category Tonnage (Mt) Silver Grade (g/t) Metal Cont. (Moz Ag) Indicated 2.93 482 45.3 Inferred 0.31 417 4.1 (1) Source: Refer to NI43-101 technical report with effective date of September 30, 2024, titled “El Quevar Project, Salta Province, Argentina, NI 43-101 Technical Report on Updated Mineral Resource Estimate”, posted on www.SEDAR.com under Golden Minerals Company. - Projects
El Quevar Project
This interactive 3D model lets you navigate the 57,000-hectare district, view infrastructure, images, drill holes + highlighted intercepts, and see the high-grade silver resource model from (2024 NI 43-101). Rotate, zoom, and explore El Quevar.
Located at approximately 300km northwest of Salta Province capital city -3.5 hour drive-, El Quevar project is one of the less remote projects on the Argentine Andes. A road, power lines, railroad and a mining-dedicated gas pipeline are at reach (4 km) from the camp and project areas. Pocitos town is located to the west, at 4km on the nearby salt plain, and 20 km to the north there are 2 solar farms, including one of the biggest solar farms in South America.
High-grade, low-tonnage, pure silver play
Unlocked expansion potential due to previous lack of funding and poor market timing.
Past Drilling Success
Highlighting Exceptional, High-Grade Results
QVD-412
1,026 g/t Ag over 40.0 m
QVD-414
545 g/t Ag over 43.20 m
QVD-426
517 g/t Ag over 20.0 m
QVD-316
2m @ 2,960 g/t Ag
QVD-378
8m @ 779 g/t Ag
QVD-251
6m @ 629 g/t Ag
QVD-194
13m @ 1,143 g/t Ag
Infrastructure for Success
Internal- Ready-to-use camp for 100 workers.
- Over 60kms of internal roads (high construction cost).
- Over 400 drillholes (100,000 meters drilled).
- 1,250-meter underground decline ramp.
- 2 onsite generators.
- Core logging facilities.
- Multiple buildings, warehouses, fuel tanks.
- Explosives warehouse permitted.
External - National public road access.
- International gas pipeline at 4 km.
- High voltage power line at 20 km.
- Two photovoltaic parks located at 20 km., including the largest one in South America.
- Multiple mining friendly communities.
- Leadership
Joaquin Marias (President and Chief Executive Officer, Previously served as Vice President, Exploration and a member of the Board of Directors. He is focused on creating sustainable value for stakeholders by advancing the El Quevar Project.), Geir Liland (Board Member, Former CEO of Argenta Silver Corp.), Nicolas Bendersky (Board Member, Holds a degree in Economics and a Master’s in Finance from CEMA University. He has extensive experience in corporate finance and has served on the boards of various public and private companies in Israel.)
Verified data last updated:
Recent filings
Investor FAQ
The most recent document in the index is a proxy filed on 2026-11-18, and the company also filed financial statements on the same date. Other recent items include a press release dated 2026-10-26 and a press release dated 2026-10-05, but the specific content of these documents is not included in the verified company data provided. The substance of the latest news cannot be confirmed from the available information.
Not disclosed in available filings. The verified company data and document index do not identify specific scheduled upcoming catalysts such as drilling programs, resource updates, or project milestones with dates. The 2026-11-18 proxy filings may relate to upcoming shareholder meetings, but their agenda is not included in the available data.
Answers last refreshed: