Bunker Hill Silver is focused on revitalizing America's silver supply through a portfolio of silver and critical minerals projects that encompass production, development, and exploration. The company operates entirely within the U.S., with a market capitalization of approximately $165.7 million. Bunker Hill aims to ramp up production from over 980,000 ounces of silver-equivalent in 2026 to 2.5 million ounces in 2027, with plans for a significant expansion to achieve annual production of over 5 million ounces. The company boasts a strong resource base with 80 million ounces of measured and indicated silver-equivalent and over 308 million ounces inferred across its assets. Bunker Hill is led by a seasoned team with extensive experience in mining operations and capital markets, and it has established partnerships with U.S. government agencies to support its projects.
Verified company data
- Shares outstanding
- 83.7M
- Fully diluted shares
- 117.1M
- Mineral resource
Bunker Hill Project Technical Report Effective Date: August 29, 2022. Red Mountain VMS Property Technical Report Effective Date: January 12, 2024. Hughes Silver-Gold Property Technical Report Effective Date: October 22, 2024.
- Projects
Bunker Hill Project
Idaho, USAAbout Bunker Hill
The Bunker Hill Mine stands as a legendary fixture in American mining history, renowned for its exceptional base metal and silver production. Discovered in 1885, this iconic mine operated for over a century until its closure in 1991. During its remarkable 95-year run, Bunker Hill yielded an impressive 42.77 million tons of ore, boasting average grades of 8.43% lead, 4.52% zinc, and 3.52 ounces of silver per ton.Historical Significance
The Bunker Hill Mine's impact on the Coeur d'Alene Mining District is profound:A Leading Lead Producer
It accounted for nearly 42% of the district'sA Major Zinc Contributor
Contributed 41% of the total zinc outputA Strong Silver Legacy
Produced 15% of the district's total silver yieldProduction Highlights
Throughout its operational history, Bunker Hill showcased remarkable productivity:Over 40 distinct mineralized zones were exploited
35 million tons of ore concentrate were produced
A staggering 165 million ounces of silver were extractedLocation
The historic Bunker Hill Mine is located in the world-class Coeur d'Alene Mining District, the Silver Valley, renowned for its rich silver deposits. This strategic location was crucial to the mine's long-standing success and significant contributions to American mineral production.Historical Context
The Bunker Hill Mine ceased operations in 1981 due to a combination of depressed base metal prices and the need for substantial capital investment to upgrade its facilities to comply with new environmental regulations. Since its closure, the mine has been under care and maintenance. As part of a U.S. Government-led regional environmental remediation effort, the mine's lead smelter and zinc processing plant were completely dismantled, and a government-operated Water Treatment Facility now manages its water discharge.Revitalization Efforts
In 2020, a new leadership team took the helm, focusing on sustainable development and exploration of Bunker Hill's untapped zinc, silver, and lead resources. This team recognized a unique opportunity to leverage historical geological and production data using modern exploration software, creating new 3D models to identify potential extensions of known mineralized bodies.Path to Production & Growth
Bunker Hill achieved first production at its Idaho mine in June 2026, marking the start of its ramp-up toward commercial production. The next phase focuses on increasing output and advancing plans for a larger-scale operation through the Bunker Hill 2.0 expansion.Advancing to Commercial Production
Following first production in June 2026, Bunker Hill is focused on ramping up operations toward commercial production.Targeting 2027 Production
The mine is targeting production of 2.5 million silver-equivalent ounces in 2027 as operations progress beyond the initial startup phase.Bunker Hill 2.0 Expansion
The planned Bunker Hill 2.0 expansion targets processing capacity of 2,500 tonnes per day, providing a path to increased production.Longer-Term Production Potential
The proposed expansion has the potential to increase annual production toward 5 million silver-equivalent ounces, building on the mine’s initial production targets.Red Mountain Project
Alaska, USAAbout Red Mountain
Red Mountain is a district-scale polymetallic opportunity with significant upside potential in Alaska’s Bonnifield Mining District, approximately 100 km south of Fairbanks. The combination of high-grade mineralization, favorable jurisdiction and, importantly, State managed lands make the Red Mountain Project ideal for development.With an established mineral resource and a broad pipeline of exploration targets, the project offers significant potential for resource expansion and new discoveries within Bunker Hill’s U.S. portfolio.
Project Highlights
INFERRED
168.6 Moz AgEq*
Contained within 15.6 Mt
Average grade: 336 g/t AgEq*
2026 summer drilling completed; 4,136 metres across 14 holes and five targets to test resource expansion and new discovery potential- Location: Situated in Alaska, the leading silver-producing state in the U.S.
- Mineralization: Silver occurs alongside zinc, lead, copper and gold in the project's polymetallic deposits
- Exploration Scale: More than 35 known mineralized prospects extend across a 60 km trend, with resources defined at Dry Creek and West Tundra Flats
- Growth Potential: Exploration targets resources expansion at Dry Creek and new discoveries beyond the existing deposits
Mineral Resource Estimates
Note:- The 2024 Red Mountain MRE was estimated and classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) “Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines” dated November 29, 2019, and the CIM “Definition Standards for Mineral Resources and Mineral Reserves” dated May 10, 2014.
- Mr. Warren Black, M.Sc., P.Geo. of APEX Geoscience Ltd., a QP as defined by NI 43-101, is responsible for completing the 2024 Mineral Resource Estimate, effective January 12, 2024.
- Mineral resources that are not mineral reserves have not demonstrated economic viability. No mineral reserves have been calculated for Red Mountain. There is no guarantee that any part of the mineral resources discussed herein will be converted to a mineral reserve in the future.
- The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, market, or other relevant factors.
- The quantity and grade of reported Inferred Resources is uncertain, and there has not been sufficient work to define the Inferred Mineral Resource as an Indicated or Measured Mineral Resource. It is reasonably expected that most of the Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
- All figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding. Reported grades are undiluted.
- A standard density of 2.94 g/cm³ is assumed for mineralized material and waste rock. Overburden density is set at 1.8 g/cm³. For mineralized material blocks with iron assays close enough to estimate an iron value for the block, density is calculated using the formula: density (g/cm³) = 0.0553 * Fe (%) + 2.5426.
- Metal prices are US$2,750/tonne Zn, US$2,100/tonne Pb, US$8,880/tonne Cu, US$1,850/oz Au, and US$23/oz Ag.
- Recoveries are 90% Zn, 75% Pb, 70% Cu, 70% Ag, and 80% Au.
- ZnEQ (%) = [Zn (%) x 1] + [Pb (%) x 0.6364] + [Cu (%) x 2.4889] + [Ag (ppm) x 0.0209] + [Au (ppm) x 0.1923]
- AgEQ (ppm) = [Zn (%) x 47.81] + [Pb (%) x 30.43] + [Cu (%) x 119] + [Ag (ppm) x 1] + [Au (ppm) x 91.93]
- Open-pit resource economic assumptions are US$3/tonne for mining mineralized and waste material, US$19/tonne for processing, and 48° pit slopes.
- Underground resource economic assumptions are US$50/tonne for mining mineralized and waste material and US$19/tonne for processing.
- Open-pit resources comprise blocks constrained by the pit shell resulting from the pseudoflow optimization using the open-pit economic assumptions.
- Underground resources comprise blocks below the open-pit shell that form minable shapes. They must be contained in domains of a minimum width of 1.5 m at Dry Creek or 3 m height at West Tundra Flats. Resources not meeting these size criteria are included if, once diluted to the required size, maintain a grade above the cutoff.
Located in Alaska, USA
The Red Mountain Project is situated on Alaska state-managed lands, free from Bureau of Land Management (BLM) or indigenous claims- Covering approximately 620 square kilometers of highly prospective geology
- Alaska is host to several world class deposits and mines
- 30-80 kilometers of highways, railways, and power, ensuring logistical efficiency and reduced development costs
- Numerous multi million ounce VMS and polymetalic deposits offering multi-commodity potential
Ownership
Bunker Hill wholly owns 942 mineral claims and one mining lease, providing extensive exploration opportunities over a 60km trend in a mining-friendly region near established infrastructureHistorical Exploration
The Red Mountain Project area has a rich history of mineral exploration, with the first sulphide outcrop discovered in 1975. Ongoing exploration efforts continue to reveal the potential for further resource expansion, particularly in the Dry Creek and West Tundra Flats zonesExploration & Development Strategy
Bunker Hill Silver is focused on further exploration of the Red Mountain Project to expand the current resource base and uncover new high-grade zones. The strategy includes:Rapid Resource Growth
Focused on the Dry Creek and West Tundra Flats (WTF) zonesTargeting New Discoveries
Drilling to identify new silver-copper-gold mineralizationAdvancing Towards Development
Fast-tracking the project to a development milestone and potential mine build.Hughes Project
Nevada, USAAbout Hughes
Discovered in 1900, Tonopah quickly became known as the Queen of the Silver Camps, with people from all over the country rushing to Nevada in hopes of making their fortunes. Over the next half century, the Tonopah district produced 175 million ounces of silver and 1.86 million ounces of gold from 8.8 million tons of rock. Today, the existing infrastructure supports mineral exploration and development in the well-established historic mining district.A World-Class Mining Jurisdiction
Nevada- Top-3 ranked Global Mining Investment Jurisdiction
- 5.6M oz of gold production annually
- Originally known as the Silver State
Walker Lane Trend
- Endowment of at least 80 M oz of gold and 700 M oz of silver
Located in the heart of the famous historic Tonopah District and covering 5km of its possible eastern extension, the Hughes Project represents a unique opportunity to both revitalize a historic district and make new discoveries in the shadows of the headframes of some of America’s great historic silver producers.
Project Highlights
INDICATED
10.26M AgEq
Contained within 0.96 Mt
333 g/t AgEq
INFERRED
32.91M AgEq
Contained within 2.43 Mt
421 g/t AgEq
INFERRED: TALININGS
2.74M AgEq
Contained within 2.43 Mt
421 g/t AgEq- Mineralized zones open to expansion
- Excellene metallurgical recoveries 90% Silver & 97% Gold
- Significant Resource upside with assays pending
- Over 90% of the resource is located on Private Land
Geology
The Tonopah mining district is an intermediate sulfidation epithermal vein system. Productive veins in the district are hosted in volcanic rocks which range in composition from andesite to rhyolite. High-grade mineralization in the veins consists of argentite, polybasite, electrum, sphalerite, galena and chalcopyrite. The host volcanic rocks adjacent to the veins are altered to quartz, sericite and adularia. This zone of potassium-silica alteration grades outwards into an argillic zone of alteration consisting of kaolinite, halloysite, sericite, and montmorillonite, which in turn grades outwards into propylitic alteration.- Leadership
Richard Williams (Executive Chairman, Former COO of Barrick Gold, delivering an 80% increase in operating profit and leading the reset of Barrick's relationship with the Tanzanian Government. Commanded the British Special Forces Regiment (SAS). Former director at Trevali Mining and Gem Diamonds.), Sam Ash (CEO & Director, Former Executive GM of Barrick's Lumwana Mine in Zambia, delivering over $100M in free cash flow improvements and a 50% improvement in safety performance. CEO of Bunker Hill since 2020, leading the mine from acquisition through financing, rebuild and restart to first production in June 2026.), Galen McNamara (PRESIDENT & CIO, CEO of Silver47 and P.Geo. with 20+ years in exploration and capital markets. Co-winner of the PDAC Bill Dennis Prospector of the Year Award (2018) for the world-class Arrow uranium discovery. Co-founder of Summa Silver, Gold X2 Mining and others; instrumental in raising over C$200M in equity financings since 2020.), Bradley Barnett (Chief Financial Officer, Over 30 years of international business experience including senior CEO, CFO and MD roles, previously serving as a Managing Director at Barrick. Helped establish Bunker Hill's landmark relationship with the U.S. EPA — restructuring historical environmental liabilities and unlocking the investment that enabled the mine's restart.), Giordy Belfiore (VP Investor Relations, Investor relations and corporate development professional with extensive experience across public and private companies in the metals and mining sector. Played a pivotal role in helping raise $50M+ in his previous role as VP, Corporate Development at Silver 47.), Tom Francis (GENERAL MANAGER, 10 years with Rio Tinto, most recently Mine Manager at Kennecott Bingham Canyon in Utah — with prior roles spanning the full mine-to-refinery value stream. Former officer in the Royal Marines and UK Special Forces, with operational tours in Kosovo, Iraq and Afghanistan.), Mark Hayes (GENERAL COUNSEL, Extensive legal experience across mining, natural resources and energy. Former Senior Corporate Counsel for Nuton, a Rio Tinto Venture, and corporate counsel roles at Rio Tinto advising on transactions, governance, regulatory matters, and mining projects.), Mark McBride (VP Finance, Over a decade of mining-industry finance experience — formerly Corporate Controller at Great Panther Mining and Manager of Financial Reporting at Pretium Resources. CPA who began his career at PwC auditing global miners including Rio Tinto, Anglo American and Teck.)
Verified data last updated:
Recent filings
Investor FAQ
The most recent document in the index is dated 2026-11-13 (an 'other' filing), preceded by a press release dated 2026-11-06 and another press release dated 2026-11-03. The specific content of these documents is not included in the verified company data provided, so the substance of the latest news cannot be confirmed from the available information. The company's last verified data timestamp is 2026-11-13.
- Notice ·
- News release ·
- News release ·
Company materials identify several potential catalysts: first production at the Bunker Hill mine in Idaho in June 2026, a targeted production of 2.5 million silver-equivalent ounces in 2027, and the planned Bunker Hill 2.0 expansion targeting processing capacity of 2,500 tonnes per day with potential to increase annual production toward 5 million silver-equivalent ounces. At Red Mountain, 2026 summer drilling of 4,136 metres across 14 holes was completed to test resource expansion and new discovery potential, and at Hughes, significant resource upside is noted with assays pending. Timing of results or milestones beyond these stated targets is not disclosed in available filings.